Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAdmitted-Finance | ₹10.9 L | L1 | Admitted-Finance |
| 2 | L2₹14.6 L+₹3.7 L (34.4%)Admitted-Finance | ₹14.6 L+₹3.7 L (34.4%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PRANAV JAIN CONTRACTOR L2 | SK CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Earth work of silt clearance of channels and drains | |||||
| 2.00 | ((b)) Basket work with combined lead upto 7.50 metres undressed. | 2,724.27 | Cum | 160 ₹4,35,883.2 | 123.42 ₹3,36,229.4 Lowest |
| 3.00 | ((d)) Extra for every 7.5 metres additional lead. | 2,724.27 | Cum | 50 ₹1,36,213.5 | 33 ₹89,900.91 Lowest |
| 4.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((h)) Extra for slush. | 2,724.27 | Cum | 70 ₹1,90,698.9 | 60.75 ₹1,65,499.4 Lowest |
| 5.00 | Making dewatering arrangement by pumping set 4 *4 (Tractor driven) | 32.66 | Hour | 1,200 ₹39,192 | 894 ₹29,198.04 Lowest |
| 6.00Clearance of weed, jalla, deela, sarkanda, jungle, butti, dhora, silts etc manually from inner section of lined channel((d)) Concrete Lined | |||||
| 7.00 | ((i)) discharge upto 0.283 cumecs | 6,700 | Mtr | 15 ₹1,00,500 | 9.29 ₹62,243 Lowest |
| 8.00 | ((iv)) discharge exceeding 2.83 cumecs | 18,648.22 | Mtr | 30 ₹5,59,446.6 | 21.68 ₹4,04,293.41 Lowest |
Tender Value
₹11.1 L
EMD Value
₹22,220
Closing Date
13 May 2026, 12:00 pmClosed
Executive Engineer Kandi Canal 1 and Ground water
Executive Engineer Kandi Canal 1 and Ground water
Estimate for clearance of muck, slush, weed jala from canal bed and Canal Syphon between reach RD 0m to 20335m of kandi canal and Ghogra distributary RD 0m to 6700m offtaking from RD 18563m of Kandi Canal Stage-1 Hoshiarpur
2026_WR_167187_1
65
Open Tender
Civil Works - Canal
Item Rate
30 days
Hoshiarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹22,220
Yes
15 May 2026
28 Apr 2026
13 May 2026
28 Apr 2026
13 May 2026
28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work of silt clearance of channels and
drains | - | - | - | - |
| 2 | ((b)) Basket work with combined lead upto 7.50 metres undressed. | 2,724.27 | Cum | - | - |
| 3 | ((d)) Extra for every 7.5 metres additional lead. | 2,724.27 | Cum | - | - |
| 4 | Earth work excavation in ordinary soil, exclusive of compensation of earth:- ((h)) Extra for slush. | 2,724.27 | Cum | - | - |
| 5 | Making dewatering arrangement by pumping set 4 *4 (Tractor driven) | 32.66 | Hour | - | - |
| 6 | Clearance of weed, jalla, deela, sarkanda, jungle, butti, dhora, silts etc manually from inner section of lined channel((d)) Concrete Lined | - | - | - | - |
| 7 | ((i)) discharge upto 0.283 cumecs | 6,700 | Mtr | - | - |
| 8 | ((iv)) discharge exceeding 2.83 cumecs | 18,648.22 | Mtr | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_339536.xls
BOQ • 0.34 MB
Corrcivil11052026.pdf
PDF • 0.35 MB
corrcivil08052026.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .