Loading…
Loading…
Tender Value
₹1.9 L
EMD Value
₹3,880
Closing Date
10 Sept 2026, 4:30 pm
Er. fayaz Ahmed
Executive enineer REW Ramban
as per NIT
2026_RDPR_322236_2
e-Nit 22.4 of REW Ramban(Ukheral )
Open Tender
Civil Works
Percentage
UKHRAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive enineer REW Ramban
₹3,880
25 Aug 2026
25 Aug 2026
11 Sept 2026
25 Aug 2026
10 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trench (not exceeding, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | cum | 479.3 | - |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | - | cum | 7,104.35 | - |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 9,821.55 | ₹9,811.73 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level | - | kg | 123.2 | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundation | 1 | sqm | 286.35 | ₹286.06 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for:suspended floors | 1 | sqm | 718.2 | ₹717.48 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for:beams | - | sqm | 577.55 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for edges | 1 | m | 262.2 | ₹261.94 |
| 9 | Carriage of cement from source to site by mechanical transport or animal transport or by head load (STA) | - | ton | 1,214.83 | - |
| 10 | Carriage of Sand from source to site by mechanical transport or animal transport or by head load (STA) | - | cum | 4,332.92 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.13 MB
BOQ_1078924.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].