Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | ₹2.0 L | 1 | Accepted-Finance L-1 |
| 2 | 2₹2.0 LAccepted-Finance | ₹2.0 L | 2 | Accepted-Finance L-2 |
| 3 | 3₹2.2 LAccepted-Finance | ₹2.2 L | 3 | Accepted-Finance L-3 |
| Sl No | Description | Qty | Unit | lodhi switchgear enterprises L2 | M/S YASHVARDHAN ENGINEERING WORKS L1 | R S ASSOCIATE AND CONSTRUCTION PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Following plantation work is to be done at various 400/220/132 KV S/Ss Under ETD, Raebareli and other designated places. Cost of all other associated required works i.e. arrangement of water for irrigation plants. Pesticides and Organic Fertilizer (Gobar khaad) shall be provided by contractor at his own cost as rates given below are inclusive of all these associated works- | ||||||
| 1.10 | Excavation of ordinary soil (Loam Clay or Sand) including its back filling after plantation (Size 0.5 mtr depth, 0.25 mtr radius cylindrical pit) | 338 | Cum | 130 ₹43,940 | 122 ₹41,236 Lowest | 130 ₹43,940 |
| 1.20 | Carriage of various types of plants in a private vehicle from the primary substation/designated location to various plantation sites. The work also includes digging of pits and all associated activities related to plantation. | 3,220 | Nos. | 40 ₹1,28,800 | 39.4 ₹1,26,868 Lowest | 45 ₹1,44,900 |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
2 Jul 2026, 5:00 pmClosed
EE
132 KV S/S TRIPULA CAMPUS, RAEBARELI
WORK
2026_UPTCL_1164112_1
E-Tender No ETDR/03/2026-27
Open Tender
Electrical Works
Item Rate
10 days
ETD RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD RAEBARELI
₹2,000
3 Jul 2026
26 Jun 2026
3 Jul 2026
26 Jun 2026
2 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Following plantation work is to be done at various 400/220/132 KV S/Ss Under ETD, Raebareli and other designated places. Cost of all other associated required works i.e. arrangement of water for irrigation plants. Pesticides and Organic Fertilizer (Gobar khaad) shall be provided by contractor at his own cost as rates given below are inclusive of all these associated works- | |||||
| 1.1 | Excavation of ordinary soil (Loam Clay or Sand) including its back filling after plantation (Size 0.5 mtr depth, 0.25 mtr radius cylindrical pit) | 338 | Cum | - | - |
| 1.2 | Carriage of various types of plants in a private vehicle from the primary substation/designated location to various plantation sites. The work also includes digging of pits and all associated activities related to plantation. | 3,220 | Nos. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
TD.pdf
Tender Documents • 1.44 MB
BOQ_2182600.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].