| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-AOC | L1 | Accepted-AOC Thiru. Anas Eddalath has been quoted lowest rate of 0.01 percentage below from the estimate rate and his rate has been approved. | |
| 2 | L2₹3.5 L+₹17,560.24 (5.31%)Rejected-Finance | L2 | Rejected-Finance Thiru. P. Nowshad has been quoted lowest rate of 5.31 percentage above from the estimate rate. |
| Sl No | Description | Qty | Unit | P Nowshad | ANAS EDDALATH |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B
( TNDSS NO. 23,24, VI(S2) VII, 9 10) | 3 | m3 | 810 ₹955.8 Lowest | 810 ₹955.8 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggregate) using 40 mm size ISS HBG metal from approved quarry using Vibrator including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard specifications. TNDSS NO: 30 & 86 | 17 | m3 | 1,70,000 ₹2,00,600 | 1,52,388 ₹1,79,817.84 Lowest |
| 3.00 | Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 | 12 | m2 | 8,004 ₹9,444.72 Lowest | 8,004 ₹9,444.72 Lowest |
| 4.00 | Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 7 | m3 | 68,229 ₹80,510.22 Lowest | 68,229 ₹80,510.22 Lowest |
| 5.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 9 | m3 | 93,168 ₹1,09,938.24 Lowest | 93,168 ₹1,09,938.24 Lowest |
| 6.00 | Plastering with cement mortar 1:3 (One part of Cement and three part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 20 | m2 | 8,400 ₹9,912 Lowest | 8,400 ₹9,912 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
10 Sept 2025, 3:00 pmClosed
Executive Officer
Devarshola Town Panchayat Office, Devarshola Post, The Nilgiris - 643207.
15th Finance-Untied Grant-2025-2026- IInd Installment - Providing C C Footpath at Alavayal ST Colony Near Suresh House Ward No.15.
2025_DTP_601296_1
292/2025/A1-11
Open Tender
Civil Works
Works
120 days
Devarshola Town Panchayat Office
15th Finance-Untied Grant-2025-2026- IInd Installment - Providing C C Footpath at Alavayal ST Colony Near Suresh House Ward No.15.
2 documents required · 2 mandatory
₹0
₹4,000
Yes
15 Sept 2025
6 Sept 2025
10 Sept 2025
6 Sept 2025
10 Sept 2025
6 Sept 2025
6 Sept 2025 - 10 Sept 2025
Earth work excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales, murram, ordinary earth, earth mix with 50% fair sized boulders etc., with initial lead and lifts including laying, spreading, leveling, sectioning breaking clods etc., including all incidental charges etc., complete as per standard specification . for Foundations SS 20B ( TNDSS NO. 23,24, VI(S2) VII, 9 10)
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggregate) using 40 mm size ISS HBG metal from approved quarry using Vibrator including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with standard specifications. TNDSS NO: 30 & 86
Supplying and erecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Plain Cement Concrete 1:3:6 (one cement, three crushed Stone Sand (M- Sand) and six coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Plastering with cement mortar 1:3 (One part of Cement and three part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .