Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance NO 103 KAMARAJ NAGAR 1ST STREET BHAVANI 638301 ERODE DT | BHAVANI | ERODE | TAMIL NADU | 638301 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹15.9 L (7.52%)Admitted-Finance | ₹2.3 Cr+₹15.9 L (7.52%) | L2 | Admitted-Finance |
| 3 | L3₹2.5 Cr+₹39.0 L (18.4%)Admitted-Finance | ₹2.5 Cr+₹39.0 L (18.4%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 Cr+₹41.0 L (19.4%)Admitted-Finance 3 238 VENKATESA LAYOUT S V MILLS POST UDUMALPET 642 128 | UDUMALPET | TIRUPPUR | TAMIL NADU | 642128 | ₹2.5 Cr+₹41.0 L (19.4%) | L4 | Admitted-Finance |
| 5 | L5₹2.6 Cr+₹44.7 L (21.1%)Admitted-Finance | ₹2.6 Cr+₹44.7 L (21.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | mk constructions L1 | GUHANSANJEEVI ENTERPRISES L2 | BVD Power Private Limited L3 | vasanthaconstructions L4 | K.RAJAGOPALAN AND CO L5 | MSS CONTRACTORS L6 | K. Vaithilingam L7 | K DHINAKARAN L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CIVIL WORKS | |||||||||||
| 1.10 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | 2,924 | Cum | - | - | - | - | - | - | - | - |
| 1.20 | Earthwork excavation in SDR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | 974 | Cum | - | - | - | - | - | - | - | - |
| 1.30 | Earthwork excavation in MR and DMR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | 487 | Cum | - | - | - | - | - | - | - | - |
| 1.40 | Hard Rock by wedging cheselling, as per standard specification, etc., complete.. | 487 | Cum | - | - | - | - | - | - | - | - |
| 2.00 | PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete. | 342 | Cum | - | - | - | - | - | - | - | - |
| 3.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost fo steel reinforcement (by using mixer machine). | 408 | Cum | - | - | - | - | - | - | - | - |
| 4.00 | RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for pedestal with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine). | 911 | Cum | - | - | - | - | - | - | - | - |
| 5.00 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | 99,000 | Kg | - | - | - | - | - | - | - | - |
| 6.00 | Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, curing, etc., complete. | 719 | Sqm | - | - | - | - | - | - | - | - |
Tender Value
₹2.6 Cr
EMD Value
₹2.6 L
Closing Date
4 Oct 2019, 2:00 pmClosed
CE/TP-II/Trichy
The Chief Engineer, Transmission Projects II/Mannarpuram, Trichy.
Providing various structural and equipment plinths in 230 KV yard and foundation for 230 KV Tower type CBP for the proposed Kalivelampatty 230 110 KV SS in Coimbatore District.
2019_EB_136322_1
CE/TP II/TRY/C-24/2019-20
Open Tender
Civil Works
Works
120 days
KALIVELAMPATTY
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹2.6 L
Yes
2 Jan 2020
3 Sept 2019
5 Oct 2019
3 Sept 2019
4 Oct 2019
3 Sept 2019
Amount
CIVIL WORKS
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Earthwork excavation in SDR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete.
Earthwork excavation in MR and DMR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete.
Hard Rock by wedging cheselling, as per standard specification, etc., complete..
PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost fo steel reinforcement (by using mixer machine).
RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for pedestal with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, curing, etc., complete.
Painting the plastered wall surface with ready mixed plastic emulsion paint of first class quality over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete.
Supplying of hot dip Galvanising & fabrication of foundation bolt with various sizes of required length including threadingfor 150mm length withGI plateof size 100x100x12mm at the bottom of bolt 3 nos of relavent sizes GI nuts and flat washers and fixing in the position as directed by the engineer at site including assembling of templete etc cost of template all materials labour lead, lift etc complete .
Assembling of bolt & nut for all equipment structure by using supply of template & transport including cost of template & bolt and all labour lead, lift etc complete .
Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete.
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Supply & Providing anchor rod / Grip rod of 20mm dia RTS instructed by field engineer including all lead, lift, etc., complete.
Design various components of plinth & foundation and drawing with detailed drawing etc. including Cost of all labour, lead, lift etc,complete
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
GUHANSANJEEVI ENTERPRISES
BVD Power Private Limited
vasanthaconstructions
K.RAJAGOPALAN AND CO
MSS CONTRACTORS
K. Vaithilingam
K DHINAKARAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_164355.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .