Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 CrAccepted-AOC 11C BHARATHI COLONY MADUKKARAI MARKET COIMBATORE TAMIL NADU 641105 UDYAM TN 03 0003766 | COIMBATORE | TAMIL NADU | 641105 | ₹38.6 Cr Quoted ₹38.7 Cr | L1 | Accepted-AOC lowest quoted rate is accepted |
| 2 | L2₹41.1 CrRejected-Finance SAB JOHN THOTTAM OMALUR PO TK SALEM 636404 | SALEM | SALEM | TAMIL NADU | 636404 | ₹41.1 Cr | L2 | Rejected-Finance Rejected |
Tender Value
₹41.4 Cr
EMD Value
₹31.1 L
Closing Date
22 Apr 2024, 3:00 pmClosed
Chief Engineer, TWAD, Vellore
No.8, First East Main Road, Gandhi Nagar, Vellore-6
WSS to TDM SIPCOT
2024_TWAD_450509_1
IFB27tdmsipcot15224
Open Tender
Civil Works
730 days
Tindivanam
Refer bid document
5 documents required · 5 mandatory
₹0
₹31.1 L
Vellore
9 Oct 2024
23 Mar 2024
23 Apr 2024
24 Mar 2024
22 Apr 2024
24 Mar 2024
10 Apr 2024
Amount
Providing 2.64 MLD Water Supply to SIPCOT Industrial park at Tindivanam in Villupuram District with Cheyyar River as Source. -Construction period-24 Months, Trial run 6months, Paid Maintenance of the scheme for 12 months – e –Submission ( Deposit Work)
Construction of new Infilltration well 4.50 M dia of 8.80M depth-2 Nos
Construction of new Infilltration well 4.50 M dia of 8.00M depth-1 No
Construction of new Infilltration well 4.50 M dia of 8.20M depth-2 Nos
Supply, delivery, laying, jointing and hydraulic testing of 150mm dia DI pipe for connectingmain from Infiltration wells to collection Sump-1005m with Anchorage arrangement in Kanchipuram District
Construction of 1.65 Lakh Litre RCC collection Sump cum Pump House at Peru Nagar in Kanchipuram District
Construction of 8.80 Lakh Litre RCC Intermediate collection Sump at Theyyar in Thiruvannamalai District
Supply, delivery, erection of Open well Submerssible Pumpsets in Infilltration well -5Nos (550LPM X 14-18M) VT Pumpset 2750 X 78M in collection Sump with 100% standby and installation of electro Chlorinator.
Construction of Control room 3M X 3M- 1 No, Electro Chlorinator Room 6M X 4M -1 No and compound wall 30MX30M for Intermediate collection Sump site
Supply, delivery, laying, jointing and hydraulic testing of Transmission main from Peru Nagar collection Sump to SIPCOT OHT 5LL
Annual Maintenance of the scheme - 12 Months
Sub Total
GST in 18%
ANANTH CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid