Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.3 LAdmitted-Fee/PreQual/Technical/Finance | -22.70% | ₹19.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹19.7 L+₹48,089.44 (2.50%)Admitted-Fee/PreQual/Technical/Finance | -20.77% | ₹19.7 L+₹48,089.44 (2.50%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹22.5 L+₹3.2 L (16.7%)Admitted-Fee/PreQual/Technical/Finance | -9.80% | ₹22.5 L+₹3.2 L (16.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹24.8 L+₹5.5 L (28.7%)Admitted-Fee/PreQual/Technical/Finance | -0.50% | ₹24.8 L+₹5.5 L (28.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹25.2 L+₹5.9 L (30.7%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹25.2 L+₹5.9 L (30.7%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹24.9 L
EMD Value
₹1.2 L
Closing Date
11 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
LDA OFFICE VIPIN KHAND GOMTI NAGAR LKO.
INDRA GANDHI PRATISTHAN ME MARKARI HALL KE GENERAL MAHILA VA PURUSH KE BATHROOMO ME LAGI PURANI TILES HATAKAR NEW TILES VA ANYA FITTINGS LAGANE KA KARYA.
2026_LDAUP_1174575_1
80/E-NIVIDA/CE/2026-27(12)
Open Tender
Civil Works
Fixed-rate
90 days
LDA OFFICE VIPIN KHAND GOMTI NAGAR LKO.
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,475
SEC LDA
₹1.2 L
12 Aug 2026
4 Aug 2026
12 Aug 2026
4 Aug 2026
11 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tiled roofing with battens, boarding etc. complete including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 161.63 | Sqm | 165.81 | ₹26,799.04 |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :, Of area 3 sq. metres and below | 14 | No. | 290.07 | ₹4,060.98 |
| 3 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 21.6 | Cum | 2,805.32 | ₹60,594.91 |
| 4 | Dismantling aluminium/ Gypsum partitions, doors, windows, fixed glazing and false ceiling including disposal of unserviceable material and stacking of serviceable material with in 50 meters lead as directed by Engineer-in-charge. | 72 | Sqm | 44.52 | ₹3,205.44 |
| 5 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:, Cement mortar 1:4 (1 cement : 4 coarse sand) | 9.82 | Cum | 5,822.47 | ₹57,194.12 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 10.8 | Cum | 7,145.72 | ₹77,173.78 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 10.8 | Cum | 5,381.16 | ₹58,116.53 |
| 8 | 12 mm cement plaster of mix :, 1:4 (1 cement: 4 coarse sand) | 319.65 | Sqm | 282.29 | ₹90,234 |
| 9 | Providing and laying of 10MM Double Charged floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 1200x600 | 316.5 | Sqm | 2,150 | ₹6,80,475 |
| 10 | Providing & Fixing of Armstrong Mineral Fibre Acoustical Suspended Ceiling System with Dune (Bevelled Tegular) Edge Tiles With Armstrong 15mm Exposed GRID. The tiles should have Humidity Resistance (RH) of 99%, NRC 0.7, Light Reflectance ≥85%, Thermal Conductivity k = 0.052 - 0.057 w/m K, Colour White, Fire Performance UK Class 0 / Class 1 (BS 476 pt - 6 &7) in module size of 600 x 600 x 15mm , suitable for Green Building application, with Recycled content of 63%. The tile shall be laid on Armstrong Suprafine 32 with 15 mm wide T - section flanges colour white having rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 32mm and a load carrying capacity of 8.8 Kgs/M2 & pull out strength of 100Kgs. The T Sections have a Galvanizing of 90 grams per M2 and need to be installed with Suspension system of Armstrong make. INSTALLATION: To comprise main runner spaced at 1200mm centres securely fixed to the structural soffit using Armstrong suspension system (specifications below) at 1200mm maximum centre. The First/Last Armstrong suspension system at the end of each main runner should not be greater than 450mm from the adjacent wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm centre to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be Armstrong wall angles of size 3000x19x19mm, secured to walls at 450 mm maximum centres. ARMSTRONG SUSPENSION SYSTEM - Armstrong make Anchor Fastener, Hanger Wire 2.5mm dia, Hook Clip with J Wire assembly. Approved Makes - Armstrong, Shera, Nitco. | 72 | Sqm | 2,240 | ₹1,61,280 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.28 MB
BOQ_2206959.xls
BOQ • 0.43 MB
TENDERDOCUMENT.pdf
Tender Documents • 5.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .