Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.8 LAccepted-AOC C O SHRI SUKHDEV SINGH VILL PIRAULI PO PIRAULI KISHANPUR DISTT MUZAFFARNAGAR | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L-1 | Accepted-AOC BEING L-1 BIDDER | |
| 2 | Rejected-Technical MAIN ROAD JARHI POST BHATGAON DISTT SURAJPUR C G PIN 497235 | SURAJPUR | CHHATTISGARH | 497235 | - | Rejected-Technical NOT BEING L-1 BIDDER | |
| 3 | Rejected-Technical | - | Rejected-Technical NOT BEING L-1 BIDDER | |
| 4 | Rejected-Technical | - | Rejected-Technical NOT BEING L-1 BIDDER |
Tender Value
₹41.4 L
EMD Value
₹51,900
Closing Date
23 Dec 2023, 5:00 pmClosed
GENERAL MANAGER(Opr.), BHATGAON AREA, SECL
OFFICE OF THE GENERAL MANAGER, BHATGAON AREA, POST BHATGAON COLLIERY, DIST SURAJPUR STATE C.G. PIN 497235
Roof bolting for roof support with DGMS approved portable hydraulic roof bolting machine with drilling arrangement to drill 1.5m long hole in roof having hard strata with 27mm dia. drill bit for anchoring 20/22mm dia. roof bolt with resin capsule and
2023_SECL_295765_1
GM/BHAT/SUR/e-Tender/23-24/46 Dt 11.12.23
Open Tender
Miscellaneous Works
Item Rate
180 days
Bhatgaon Ug Mine, Bhatgaon Area
AS PER NIT CRITERIA
3 documents required · 3 mandatory
₹51,900
Yes
5 Jan 2024
12 Dec 2023
25 Dec 2023
12 Dec 2023
23 Dec 2023
13 Dec 2023
12 Dec 2023 - 19 Dec 2023
Amount
Item Description/ Heading
Roof bolting for roof support with DGMS approved portable hydraulic roof bolting machine with drilling arrangement to drill 1.5m long hole in roof having hard strata with 27mm dia. drill bit for anchoring 20/22mm dia. roof bolt with resin capsule and fitting of bearing plates and tightening to nuts at (-7LS) contiguous depillaring panel in UPP seam and fittng of w straps as and when required including loading of roof bolt, bearing pate, W-strap and resin capsule into tub at incline mouth and unloading the same at destination in depillaring panel at Bhatgaon Colliery under Bhatgaon Area. Note:(1) Roof bolt rod bearing plate resin capsule electric power and water will supply departmently on free of cost. (2) Transportation of roof bolts rod bearing plate nut resin capsule power cable water hoses and shifting of power pack shall be done by contractor . (3) Power cable and water hoses from power pack to drill machine shall be supplied by contractor. (4) Shifting of power pack and drill machine shall be done by contractor. (5) Hydraulic oil for power pack shall be supplied by contractor (6) Drill rod drill bit and other necessary parts hoses etc of the drilling machine required there is will be arranged by contractor (7) All maintenance and related shifting by contractor. (8)Hudraulic wet drilling shall be used to avoid manual drilling in roof (9) Hydraulic roof drilling machine with power pack will be supplied by contractor.
TOTAL IMPACT OF GST FOR THE PURPOSE OF CTC
UPHEAD MANAGEMENT CONSULTING PRIVATE LIMITED
M/S AKM ASSOCIATES
JEEWAN SINGH RAUTELA
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_306430.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .