Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.0 LAdmitted-Finance | -39.75% | ₹6.0 L | L1 | Admitted-Finance |
| 2 | L2₹6.1 L+₹11,592.14 (1.94%)Admitted-Finance | -38.58% | ₹6.1 L+₹11,592.14 (1.94%) | L2 | Admitted-Finance |
| 3 | L3₹6.4 L+₹43,495.29 (7.29%)Admitted-Finance | -35.36% | ₹6.4 L+₹43,495.29 (7.29%) | L3 | Admitted-Finance |
| 4 | L4₹7.4 L+₹1.4 L (23.6%)Admitted-Finance | -25.51% | ₹7.4 L+₹1.4 L (23.6%) | L4 | Admitted-Finance |
| 5 | L5₹7.4 L+₹1.5 L (24.6%)Admitted-Finance | -24.91% | ₹7.4 L+₹1.5 L (24.6%) | L5 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,800
Closing Date
1 Jun 2026, 6:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA POKARAN
Construction of B/W at Ward no 03 Sabha Bhawan
2026_DLB_560013_1
RO NO 100 WORK NO 08
Open Tender
Civil Works
Percentage
60 days
POKARAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
E.O NAGAR PALIKA POKARAN
₹19,800
Yes
12 Jun 2026
18 May 2026
2 Jun 2026
18 May 2026
1 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.Depth upto 1.5 m | - | P.cum | 229.5 | - |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | P.Cum | 4,575 | - |
| 3 | Random rubble masonry with hard stone in foundation and plinth :Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | P.Cum | 4,860 | ₹4,855.14 |
| 4 | Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) :Flush/ Ruled pointing | 480 | P.Cum | 225 | ₹1,08,000 |
| 5 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete: | - | P.KG | 114.5 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_996898.xls
BOQ • 0.22 MB
Provisions.pdf
Tender Documents • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .