Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.2 LAccepted-Finance 111 MINI SHOPPING COMPLEX NEAR HOTEL ASIA NEHRU MARKET JAMMU JAMMU KASHMIR 180004 | JAMMU | JAMMU AND KASHMIR | 180004 | 1 | Accepted-Finance Found Eligible | |
| 2 | 2₹2.2 L+₹850 (0.39%)Accepted-Finance JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | 2 | Accepted-Finance Found Eligible | |
| 3 | 3₹2.2 L+₹1,150 (0.53%)Accepted-Finance JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | 3 | Accepted-Finance Found Eligible |
| Sl No | Description | Qty | Unit | Vaibhav Engineers and Technocrates L2 | AADISHWAR ELECTRICAL AND MECHANICAL WORKS L1 | M/S MUSKAN ELECTRICAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | 1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump half coupling) of Unit No.05, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly Qty. 01 Complete job.
2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each Qty. 01 Complete job.
3. Transportation charges for shifting of worn-out items from LIS Ranjan to workshop and back shifting to site of installation after strengthening / reconditioning involving manual loading, mechanical transportation and handling charges Qty. 01 Complete job.
4. Reconditioning of SS AISI-410-line shaft 70 mm dia. 2.15 mtrs. long at worn out portions by way of rebuilding the worn out, undersize portions by remetalling with special SS welding electrodes in layers and then turning, grinding, polishing, finishing to true size and specifications including rebuilding, finishing of key ways to true size. Also removing & checking eccentricity of line shaft with dial gauge at various off sets. Removing deflection/eccentricity by heat treatment or on hydraulic press, removing of deflections on heads/ ends and then again checking the alignment of the shaft on lathe machine. P/F of new fabricated AISI-410-SS cotter pins of line shaft Qty. 03 Complete job.
5. Strengthening/Reconditioning of column assembly components by Fabrication of C.I. guide spider set with three legs complete comprising of one no. guide spider suitable for line shaft of size 70mm dia. three no.’s rubber pads and slotted CS M12 x 20mm screw, one no. rubber bearing, one no. cover for rubber bearing and bearing screws and washers Qty. 03 Complete job.
6. Repairing of Guide spider by way of replacement of rubber bearings, nitrile rubber pads for arms, CS head screws M12 x 20mm, MS cover dia. 130mm with drilled 4 nos. holes for rubber bearing locking and locking screws M10 mm Qty. 04 Complete job
7. Reconditioning of 200 mm dia. x 2000mm length, ERW shaft enclosing tube by cutting, removing from both ends of 200 mm dia. shaft enclosing flanges and fitting of new flanges similar size as specification to each end of the tube which should have six nos. of M20 dia. size threads, MS welding to both ends of the flanges with main tube and then turning, facing both the ends in respect of all over accurate thickness, straightening and alignment, facing of the flanges. Qty. 05 Complete job
8. Assembling of each column one by one with 70 mm shaft, 200mm internal tube and 500mm external pipe in sequence while lowering in the respective pit along with assembled bowl assembly. This includes fitting, lowering of line shafts, guide spiders, muff couplings, top shaft, tension tube, deflector tube, joining of discharge surging head with delivery line 500 mm dia. along with providing and fitting of relevant joining material, fire fly sheet, graphite packing, grease packing, 19 mm size nuts, bolts, washers, fitting and tightening after complete alignment, leveling etc Qty. 01 Complete job
9. Testing of pumping unit which includes installation of 485 KW, 650 HP, 6.6 KV VT motor solid shaft BHEL make HT motor on the skirt and its alignment with respective pump half coupling, reconnection of dismantled cable connections of 6.6 KV, 3 phase to rotor, stator, slipring assembly, liquid rotor starter trifurcated sealing box and space heater, cleaning of all carbon brushes, connecting of motor half coupling with pump half coupling, checking all connections with proper alignments and adjustment and testing of pumping unit for its proper operation Qty. 01 Complete job | 1 | Job | 4,334 ₹2,12,366 | 4,317 ₹2,11,533 Lowest | 2,170 ₹2,14,830 |
Tender Value
₹2.2 L
EMD Value
₹4,346
Closing Date
24 Jun 2025, 2:00 pmClosed
Executive Engineer MID Akhnoor/Nowshera
Office of Executive Engineer MID Akhnoor/Nowshera
Repair / Reconditioning/ fabrication of worn-out column assembly components of 20 cusec Jyoti make (3stage) 700T1 A6, 20 cusecs discharge VT pump no. 05 installed at LIS Ranjan
2025_IFC_278545_1
MID/AN/18
Open Tender
Machineries/ Mechanical Engg Items
Item Wise
15 days
Ranjan
Please refer Tender documents.
7 documents required · 7 mandatory
₹200
Executive Engineer MID Akhnoor/Nowshera
₹4,346
Yes
Office of Executive Engineer MID Akhnoor/Nowshera
7 Aug 2025
10 Jun 2025
25 Jun 2025
10 Jun 2025
24 Jun 2025
12 Jun 2025
11 Jun 2025
1. Dismounting of 485 kW, 650 HP BHEL Make HT motor from its place of installation by way of disengaging all its three phase cable connections of rotor, stator, commutator assembly, trifurcated sealing box, etc. Opening & disengaging coupling set (Motor half coupling & Pump half coupling) of Unit No.05, separating motor from motor skirt by opening all its nuts & bolts and placing motor on steel fabricated stool properly Qty. 01 Complete job. 2. Extraction of whole pumping unit from its respective pit by way of dismantling, opening all internal and external 500 mm dia. x 200 mm dia. x 70 mm dia. lengths of column assembly components in sequence along with connected fittings such as muff coupling, C.I. Guide spiders, top shaft, stuffing box, C.I. Bell mouth, enlarger, strainer and bowl assembly lubrication system of column assembly one by one and stacking of each at pump house after checking and segregating of damaged defective parts of each Qty. 01 Complete job. 3. Transportation charges for shifting of worn-out items from LIS Ranjan to workshop and back shifting to site of installation after strengthening / reconditioning involving manual loading, mechanical transportation and handling charges Qty. 01 Complete job. 4. Reconditioning of SS AISI-410-line shaft 70 mm dia. 2.15 mtrs. long at worn out portions by way of rebuilding the worn out, undersize portions by remetalling with special SS welding electrodes in layers and then turning, grinding, polishing, finishing to true size and specifications including rebuilding, finishing of key ways to true size. Also removing & checking eccentricity of line shaft with dial gauge at various off sets. Removing deflection/eccentricity by heat treatment or on hydraulic press, removing of deflections on heads/ ends and then again checking the alignment of the shaft on lathe machine. P/F of new fabricated AISI-410-SS cotter pins of line shaft Qty. 03 Complete job. 5. Strengthening/Reconditioning of column assembly components by Fabrication of C.I. guide spider set with three legs complete comprising of one no. guide spider suitable for line shaft of size 70mm dia. three no.’s rubber pads and slotted CS M12 x 20mm screw, one no. rubber bearing, one no. cover for rubber bearing and bearing screws and washers Qty. 03 Complete job. 6. Repairing of Guide spider by way of replacement of rubber bearings, nitrile rubber pads for arms, CS head screws M12 x 20mm, MS cover dia. 130mm with drilled 4 nos. holes for rubber bearing locking and locking screws M10 mm Qty. 04 Complete job 7. Reconditioning of 200 mm dia. x 2000mm length, ERW shaft enclosing tube by cutting, removing from both ends of 200 mm dia. shaft enclosing flanges and fitting of new flanges similar size as specification to each end of the tube which should have six nos. of M20 dia. size threads, MS welding to both ends of the flanges with main tube and then turning, facing both the ends in respect of all over accurate thickness, straightening and alignment, facing of the flanges. Qty. 05 Complete job 8. Assembling of each column one by one with 70 mm shaft, 200mm internal tube and 500mm external pipe in sequence while lowering in the respective pit along with assembled bowl assembly. This includes fitting, lowering of line shafts, guide spiders, muff couplings, top shaft, tension tube, deflector tube, joining of discharge surging head with delivery line 500 mm dia. along with providing and fitting of relevant joining material, fire fly sheet, graphite packing, grease packing, 19 mm size nuts, bolts, washers, fitting and tightening after complete alignment, leveling etc Qty. 01 Complete job 9. Testing of pumping unit which includes installation of 485 KW, 650 HP, 6.6 KV VT motor solid shaft BHEL make HT motor on the skirt and its alignment with respective pump half coupling, reconnection of dismantled cable connections of 6.6 KV, 3 phase to rotor, stator, slipring assembly, liquid rotor starter trifurcated sealing box and space heater, cleaning of all carbon brushes, connecting of motor half coupling with pump half coupling, checking all connections with proper alignments and adjustment and testing of pumping unit for its proper operation Qty. 01 Complete job
Vaibhav Engineers and Technocrates (BID ID -2384635)
M/S MUSKAN ELECTRICAL (BID ID -2384904)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .