Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹14.7 L
Closing Date
2 Jul 2025, 2:00 pmClosed
PR & CC
Evaluation criteria: Overall lowest L-1 cost basisAward Criteria: The job will be divided in 2 bidders in the
2500021222-HD-09050
5100021222
Open Tender
Bijnor, Uttar Pradesh
₹0
₹14.7 L
2 Jul 2025
11 Jun 2025
2 Jul 2025
2 Jul 2025
11 Jun 2025 - 18 Jun 2025
17 Jun 2025
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | Laying of Service Line (20 and | Laying of Service Line (20 and — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. a Identification of Mainline <(>&<)> Laying of Service line in O <(>&<)>M <(>&<)> Old Project area as instructed by EIC Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. It shall be the responsibility of the vendor to ensure that new LMC is installed only for those customers who are confirmed to be ready for immediate NGC. | - | meter |
| 2 | S&I of TF-20MM * 1/2" | S&I of TF-20MM * 1/2" — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. b Supply <(>&<)> installation of Tranistion Fitting (TF) alongwith associated work- 20MM * 1/2" Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. | - | Each |
| 3 | S&I of TF-32MM * 1" associated | S&I of TF-32MM * 1" associated — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. c Supply <(>&<)> installation of Tranistion Fitting (TF) alongwith associated work- 32MM * 1" Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. | - | Each |
| 4 | S&I of TAPPING SADDLE of | S&I of TAPPING SADDLE of — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. d Supply <(>&<)> installation of TAPPING SADDLE of 32MM X20MM size alongwith associated work Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. | - | Each |
| 5 | S&I of TAPPING SADDLE of | S&I of TAPPING SADDLE of — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. e Supply <(>&<)> installation of TAPPING SADDLE of 63MM X 32/20 MM size alongwith associated work Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. | - | Each |
| 6 | S&I of GI/Concrete Sleeves | S&I of GI/Concrete Sleeves — Laying of Service Line in O <(>&<)>M (Gasified) Area and Old Project(Non-Gasified) Area as per EIC/it's representatives MDPE Service Line laying in old Projects <(>&<)> O<(>&<)>M areas- Includes laying of required pipeline (for 20 <(>&<)> 32mm) in all type of surface i.e. Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after racking up of hard surface of any type by any methodology. Roads, Pavement, Footpaths etc. shall be restored (As it was earlier before excavation) once the pipeline is laid. Supply <(>&<)> installation of GI Sleeve / Concrete sleeve shall be paid seperately. All other activities mentioned in tender are applicable. Supply <(>&<)> installation of Gl Sleeves, 2.5" NB x 300 mm length/required Concrete Sleeves for domestic connections, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves with concrete mix, preparation of pedestal <(>&<)> restoration of excavated pits within the size of pedestal <(>&<)> the same pit with the laying of 20/32 mm as defined in technical specification and instruction of ElC. Normally this laying rate shall include liaison rates with statutory bodies and no separate rates are payable under this SOR. Prior written permission of EIC is required for claiming liaison item.The scope includes construction and laying reinforced cement concrete of M-25 grade (Concrete shall be design mix/nominal mix) with 20mm <(>&<)> down size graded crushed stone aggregates in Non suspended slabs/pavement slabs including pedestal/ramp etc., laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough/smooth as required in any position, shape, level and thickness etc. as specified and directed by EIC. The rates includes grouting of pockets, supply of material, tools, shuttering, Reinforcement etc. f Supply <(>&<)> Installation of GI/ Concrete Sleeves 2.5" X 300 MM Length Note : Supply, installation of sleeve, insertion of pipe, sealing the annuals, firm fixing of Sleeves with concrete mix. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge. | - | Each |
| 7 | PE line Looping using any | PE line Looping using any — PE Pipe line laying for Inter-connectivity / looping with existing Pipeline by Trenchless Method, without casing as per EIC Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. a. 63 mm dia | - | meter |
| 8 | PE line Looping using HDD: 90 | PE line Looping using HDD: 90 — PE Pipe line laying for Inter-connectivity / looping with existing Pipeline by Trenchless Method, without casing as per EIC Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. b. 90 mm dia | - | meter |
| 9 | PE line Looping using HDD: 125 | PE line Looping using HDD: 125 — PE Pipe line laying for Inter-connectivity / looping with existing Pipeline by Trenchless Method, without casing as per EIC Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. c. 125 mm dia | - | meter |
| 10 | PE line Looping HDD: 63mm with 5571-BIJNOR GA OFFICE OF | PE line Looping HDD: 63mm with 5571-BIJNOR GA OFFICE OF — PE Pipe line laying for Inter-connectivity / looping with existing Pipeline by Trenchless Method, with casing (Including supply <(>&<)> installation of HDPE casing pipe) as per EIC Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. a. 63 mm dia | - | meter |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2500021222-HD-09050.pdf
TENDER_DOCUMENT • 18.50 MB
Download all tender documents and submit your bid