| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | ₹14.8 L | L1 | Accepted-Finance Accept |
| 2 | L2₹14.8 LRejected-Finance | ₹14.8 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | V.Jeyaraj L1 | P.R. Ramaraj L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all soil and subsoil to full depth as directed exert hard rock etc complete | 150 | Cum | 263.75 ₹39,562.50 | 275 ₹41,250 |
| 1.02 | Cement concrete 1:4:8 mix for foundation using 40mm ISS HSG metal including all charges etc | 6.1 | Cum | 5,577.8 ₹34,024.58 | 5,589 ₹34,092.90 |
| 1.03 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 41.9 | Cum | 9,324.25 ₹3.9 L | 9,335 ₹3.9 L |
| 1.04 | Supplying and Erecting of water tight steel Shuttering and cutering including necessary supports including all labour charges etc | 272.73 | Sqm | 547.3 ₹1.5 L | 558 ₹1.5 L |
| 1.05 | Supply and Fabrication of steel for all RCC works including all charges etc | 5 | MT | 91,951 ₹4.6 L | 91,962 ₹4.6 L |
| 1.06 | PVC mould CI steps for sump | 6 | No | 461 ₹2,766 | 472 ₹2,832 |
| 1.07 | Filter Feed Pump | 1 | No | 50,000 ₹50,000 | 50,011 ₹50,011 |
| 1.08 | Pressure Sand Filter | 1 | No | 25,000 ₹25,000 | 25,011 ₹25,011 |
| 1.09 | Ozone Dozing Unit (Advance Oxidation System) | 1 | No | 1,00,000 ₹1 L | 1,00,011 ₹1.0 L |
| 2.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,25,190.67 ₹2.3 L | 2,26,140.79 ₹2.3 L |
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
9 Mar 2026, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER (V.P)
BLOCK DEVELOPMENT OFFICER (V.P) PERIYAKULAM PANCHAYAT UNION
CONSTRUCTION OF BIO - STP PLANT AT DRDA OFFICE COMPLEX IN VADAPUTHUPATTI PANCHAYAT 6 KLD
2026_RDTN_669180_1
4912/2025/A4
Open Tender
Civil Works
PERIYAKULAM
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹15,000
Yes
10 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
9 Mar 2026
2 Mar 2026
Earth work excavation in all soil and subsoil to full depth as directed exert hard rock etc complete
Cement concrete 1:4:8 mix for foundation using 40mm ISS HSG metal including all charges etc
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying and Erecting of water tight steel Shuttering and cutering including necessary supports including all labour charges etc
Supply and Fabrication of steel for all RCC works including all charges etc
PVC mould CI steps for sump
Filter Feed Pump
Pressure Sand Filter
Ozone Dozing Unit (Advance Oxidation System)
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.35 MB
BOQ_804081.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid