Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹5.0 L+₹7,216.62 (1.46%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹7,266.39 (1.47%)Rejected-Finance N A | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.0 L+₹7,515.24 (1.52%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.1 L+₹12,193.60 (2.46%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹5.0 L
EMD Value
₹9,954
Closing Date
11 Mar 2026, 12:00 pmClosed
ASSISTANT ENGINEER
ROOM NO 16 GROUND FLOOR PURTA BHAVAN DF BLOCK SECTOR I SALT LAKE KOLKATA 700 091
Emergent roof treatment work of different buildings of Dr B C Roy Phoolbagan and Beliaghata campus during the year 25 26
2026_WBPWD_1016210_1
WBPWD/AE/NKHSD-I/NIeT-16/25-26
Open Tender
CIVIL WORKS
Percentage
200 days
Dr. B.C. Roy PGIPS Hospital
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,954
Yes
23 Jul 2026
27 Feb 2026
13 Mar 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair to roof cracks with Bitumen (VG-40) including cutting grooves and cleaning cracks, heating bitumen as directed and finished with sand blinding. (Bitumen 1.687 Kg/ Sq.m, Medium Sand 0.6 Cu.m/100 Sq.m) (Bitumen to be supplied by contractor
Main buiding- | 426.25 | M² | 265.77 | ₹1,13,284.46 |
| 2 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor). [Excluding cost of chipping over concrete surface] (i) With 1:6 cement mortar 20 mm thick plaster a) In ground floor | 39.6 | M² | 204.67 | ₹8,104.93 |
| 2.01 | b) In First Floor | 19.8 | M² | 209.44 | ₹4,146.91 |
| 2.02 | c) In second floor | 27.23 | M² | 214.2 | ₹5,832.67 |
| 2.03 | d) In third floor | 31.98 | M² | 218.99 | ₹7,003.3 |
| 3 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. a) In ground floor | 0.35 | M³ | 6,857.07 | ₹2,393.12 |
| 3.01 | b) In First Floor | 0.53 | M³ | 6,970.29 | ₹3,701.22 |
| 3.02 | c) In second floor | 0.84 | M³ | 7,083.51 | ₹5,978.48 |
| 3.03 | d) In third floor | 0.84 | M³ | 7,196.73 | ₹6,074.04 |
| 4 | Supplying, fitting & fixing UPVC pipes A- Type and fittings conforming to IS:13592-1992 with all necessary clamps nails, including making holes in walls, floor etc. cutting trenches in any soil through masonry concrete structures etc if necessary and mending good damages including joining with jointing materails (Spun Yarn, Valamoid/Bitumen /M-Seal etc) complete. A) UPVC Pipes: (ii) 110 mm. Dia. | 12 | Mtr | 299.14 | ₹3,589.68 |
stage.html
html • 0.17 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
Tendernotice_2.pdf
PDF • 0.90 MB
BOQ_2496519.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .