| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | ₹12.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.6 LRejected-AOC MUTHAIAHPURAM VILATHIKULAM TK THOOTHUKUDI DISTRICT | ₹12.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹12.8 LRejected-AOC | ₹12.8 L | L3 | Rejected-AOC L3 |
| 4 | L4₹13.8 LRejected-AOC | ₹13.8 L | L4 | Rejected-AOC L4 |
| 5 | L5₹13.9 LRejected-AOC | ₹13.9 L | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | sree poorani infras L1 | K SUNDARA PANDIAN L3 | RAMALINGAM L2 | UDAYAKUMAR L6 | THANGAVELU L4 | T.MAHALINGAM L5 | K KASITHEVAR L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Strengthening to the Road From KeelaArumbur AD Colony Road Km 0/0 - 0/415 | ||||||||||
| 2.00 | Clearing the Light Jungle with out uprooting including all labour charges | 373.5 | cum | 150 ₹56,025 | 5 ₹1,867.50 | 5.77 ₹2,155.10 | 6 ₹2,241 | 6.35 ₹2,371.73 | 7 ₹2,614.50 | 6 ₹2,241 |
| 3.00 | Picking the Existing B.T surface including all labour charges etc complete | 415 | cum | 420 ₹1.7 L | 20 ₹8,300 | 21.21 ₹8,802.15 | 23 ₹9,545 | 23.34 ₹9,686.10 | 24 ₹9,960 | 23 ₹9,545 |
| 4.00 | Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete. | 93.38 | Cum | 900 ₹84,037.50 | 120 ₹11,205 | 127.53 ₹11,908.11 | 140 ₹13,072.50 | 140.31 ₹13,101.45 | 141 ₹13,165.88 | 140 ₹13,072.50 |
| 5.00Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete. | ||||||||||
| 6.00 | Km 0/0 - 0/415 | 37.35 | Sq.m | 900 ₹33,615 | 750 ₹28,012.50 | 701.13 ₹26,187.21 | 829 ₹30,963.15 | 771.4 ₹28,811.79 | 773 ₹28,871.55 | 820 ₹30,627 |
| 7.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | ||||||||||
| 8.00 | Km 0/0 - 1/0 | 189 | Sq.m | 900 ₹1.7 L | 2,900 ₹5.5 L | 2,894.03 ₹5.5 L | 3,188 ₹6.0 L | 3,184.07 ₹6.0 L | 3,188 ₹6.0 L | 3,188 ₹6.0 L |
| 9.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | ||||||||||
| 10.00 | Km 0/0 - 0/415 | 1,245 | Sq.m | 80 ₹99,600 | 80 ₹99,600 | 78.88 ₹98,205.60 | 86 ₹1.1 L | 86.78 ₹1.1 L | 87 ₹1.1 L | 87 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
6 Mar 2026, 3:00 pmClosed
Special Officer, Arumbur Panchayat
Special Officer, Arumbur Panchayat, Thiruvadanai Block
Strengthening to the Road from keelaArumbur AD Colony Road in Thiruvadanai Block
2026_RDTN_670718_1
Work01/Arumbur Panchayat/2025
Open Tender
Civil Works
90 days
Thiruvadanai Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹15,000
Yes
30 Mar 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
Strengthening to the Road From KeelaArumbur AD Colony Road Km 0/0 - 0/415
Clearing the Light Jungle with out uprooting including all labour charges
Picking the Existing B.T surface including all labour charges etc complete
Earthwork in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machineries and tippers including benching, formation fo bunds, breaking clods, sectioning etc., complete.
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Hecta metre stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Arumburdocument.pdf
Tender Documents • 0.48 MB
BOQ_806052.xls
BOQ • 0.33 MB