Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.8 LAdmitted-Finance | -42.00% | ₹5.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.9 LAdmitted-Finance | -41.41% | ₹5.9 L | L2 | Admitted-Finance |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
9 Jul 2026, 4:00 pmClosed
Executive Engineer S and D Division Ist
Suliman Complex Dalgate Srinagar
Stage contract for various repair restoration of works within the jurisdiction of S and D Sub Division Ist UEED Srinagar
2026_HAUDD_314395_2
Fresh e-NIT No.21 of 2026-27
Open Tender
Civil Works
Percentage
270 days
Sub Division Ist
As per NIT
2 documents required · 2 mandatory
₹1,200
Executive Engineer S and D Division Ist
₹20,000
14 Jul 2026
2 Jul 2026
10 Jul 2026
2 Jul 2026
9 Jul 2026
2 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
(All kinds of soil). | 10.02 | Cum | 256.85 | ₹2,573.64 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. | 6.4 | Cum | 218.4 | ₹1,397.76 |
| 3 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge (Bituminous road). | 89.6 | Sqm | 305.95 | ₹27,413.12 |
| 4 | Supply & laying of stone soling in horizontal on level. | 54 | Cum | 937.9 | ₹50,646.6 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering, All work up to plinth level. | |||||
| 5.01 | 1:2:4 (1 cement : 2 Coarse sand : 4 graded stone agg. 20mm nominal size) (crushed) | 62.8 | Cum | 6,591.25 | ₹4,13,930.5 |
| 6Providing & Laying to level & slope, with proper grade pipes of Class NP3/NP4 of following internal dia & grouting the pipe joints with cement slurry 1: 2 mix (1 cement: 2 fine sand) and also sealing the pipe joints with fixing of Rubber Gaskets incl. Cost of cement, sand, Rubber gaskets and RCC pipes incl. Testing of joints & all carriages of pipes upto site of work (Complete job). | |||||
| 6.01 | 300mm dia (NP3) | 15 | RM | 1,750 | ₹26,250 |
| 7Centering and shuttering incl. Strutting, propping etc and removal of form work for:- | |||||
| 7.01 | Edges of slab and breaks in floors in walls (above 20Cm wide). | 11.3 | Sqm | 1,145.1 | ₹12,939.63 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
BOQ_1017937.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].