| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | PANKAJ TIWARI L1 |
|---|---|---|---|---|
| 1.00Work of SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR HARPALPUR TOWN | ||||
| 1.01 | 1. Design and build sewage treatment plant of installed capacity 0.5
MLD and all appurtenant structures and allied works;
2. Survey, review the designs, redesign where necessary, and
diversion works of Nallahs flowing into Mahi River with interception
sewer of about 1.9 Km length (gravity main) including survey, design,
and all appurtenant structures and allied works; and
3. Operation & maintenance of the complete works of sewage
treatment plant, Intercepting sewer and/or interception & diversion
works of Nallahs and pumping stations for a period of 05 years after
completion of works, including defect liability period (DLP) of 5 year,
starting from the date of commission of the project | 1 | Lump-Sum | 3,74,94,004 ₹3.7 Cr |
Tender Value
₹3.6 Cr
EMD Value
₹1.8 L
Closing Date
30 Dec 2024, 5:30 pmClosed
CMO
NAGAR PARISHAD HARPALPUR
Interception and Diversion for tapping nallah and setup of sewage treatment plant for Used Water Management of Harpalpur Town FOURTH CALL
2024_UAD_388024_1
1879 DATE 10.12.2024
Open Tender
Composite Works
365 days
NAGAR PARISHAD HARPALPUR
AS PER ATTACHED TENDER DOCUMENT
4 documents required · 4 mandatory
₹15,000
₹1.8 L
11 Dec 2025
14 Dec 2024
1 Jan 2025
14 Dec 2024
30 Dec 2024
14 Dec 2024
Amount
Work of SEWAGE TREATMENT PLANT FOR USED WATER MANAGEMENT FOR HARPALPUR TOWN
1. Design and build sewage treatment plant of installed capacity 0.5 MLD and all appurtenant structures and allied works; 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs flowing into Mahi River with interception sewer of about 1.9 Km length (gravity main) including survey, design, and all appurtenant structures and allied works; and 3. Operation & maintenance of the complete works of sewage treatment plant, Intercepting sewer and/or interception & diversion works of Nallahs and pumping stations for a period of 05 years after completion of works, including defect liability period (DLP) of 5 year, starting from the date of commission of the project
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid