Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹2 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹2 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹2.2 L+₹20,000 (10.0%)Admitted-Fee/PreQual/Technical/Finance | -12.00% | ₹2.2 L+₹20,000 (10.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹7,500
Closing Date
11 Sept 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O BRICK WALLING OF ZIYARAT SHAREEF DAWOOD COLONY KAMAD BLOCK ANANTNAG
2026_RDPR_323496_48
ENIT105of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹7,500
15 Sept 2026
5 Sept 2026
12 Sept 2026
5 Sept 2026
11 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 6.79 | Cum | 1,458.85 | ₹9,905.59 |
| - | providing and laying of hand packed stone soiling including carriage of same from approved source to site of work | 2.5 | cum | 1,174 | ₹2,935 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with carriage of materails lead of 5 kms | 6.2 | cum | 6,055.5 | ₹37,544.1 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) with carriage of all materails | 1.7 | Cum | 6,790 | ₹11,543 |
| 5 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. | 600 | kgs | 138.2 | ₹82,920 |
| 6 | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 Cement : 6 Coarse sand) (including Extra Brick Work) | 9.08 | cum | 9,027.7 | ₹81,926.38 |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade.with approved steel primer etc complete job | 26.76 | sqm | 131.85 | ₹3,528.31 |
| 8 | Centering shuttering incl.starightening proping & removal of form work etc Complete job | 48.75 | sqm | 286.35 | ₹13,959.56 |
| 9 | Carriage of different material from nearest source to site of work.Bricks from Av lead of 20 Km | 4.36 | 1000nos | 1,093.15 | ₹4,766.13 |
| 10 | add cost of photographs with sign board with carriage of tiles | 1 | job | 971.93 | ₹971.93 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.36 MB
BOQ_1089450.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .