Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.0 L+₹29,471.90 (1.10%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹28.6 L+₹1.9 L (7.27%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹28.9 L+₹2.2 L (8.29%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | L5₹33.1 L+₹6.5 L (24.2%)Rejected-AOC | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | KOGANTI CONSTRUCTION COMPANY L3 | NEWS CONSTRUCTIONS L1 | RAJU AND COMPANY L5 | VACON INFRASTRUCTURES L4 | K P R ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Note: In case description of any two or more items of the schedule ‘A’ is same and the tenderer quotes different rates for such items, only lowest rate of such items will be considered for acceptance and subsequently payment will be made upon execution of the items accordingly. | ||||||||
| 1.01 | Dismantling posts or struts (wood, steel or R.C.C.) any section, including taking out embedded portion of concrete, brick masonary and making good disturbed ground all as specified and directed. | 261 | RM | 45 ₹11,745 | 10 ₹2,610 Lowest | 60 ₹15,660 | 20 ₹5,220 | 15 ₹3,915 |
| 2.00 | Excavating in post holes (or similar holes)in hard/dense soil, each n exc 0.5 cu.m, getting out, returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, complete all as specified and directed. | 145 | Each | 185 ₹26,825 | 200 ₹29,000 | 170 ₹24,650 | 200 ₹29,000 | 65 ₹9,425 Lowest |
| 3.00 | M/L cement concrete 1:3:6 type C-2 (using 40 mm graded stone aggregate) as in foundation for posts etc, incl formwork if required complete all as specified | 13.21 | Cum | 3,000 ₹39,630 | 2,850 ₹37,648.5 Lowest | 3,600 ₹47,556 | 3,000 ₹39,630 | 3,200 ₹42,272 |
| 4.00 | Dismantling of fencing wire mesh of any type complete all as specified and as directed | 530.7 | Sqm | 25 ₹13,267.5 | 10 ₹5,307 Lowest | 30 ₹15,921 | 25 ₹13,267.5 | 10 ₹5,307 Lowest |
| 5.00 | Supply only Chain link MS galvanised fencing, any size or type complete all as directed. | 1,247.15 | Kg | 105 ₹1,30,950.75 Lowest | 110 ₹1,37,186.5 | 170 ₹2,12,015.5 | 130 ₹1,62,129.5 | 110 ₹1,37,186.5 |
| 6.00 | Fixing only chain link fencing including line wires, any mesh, size and type to any type of standards, rails, straining bolts, etc. including provission of binding wire all as specified and directed | 530.7 | Sqm | 34 ₹18,043.8 | 30 ₹15,921 | 70 ₹37,149 | 30 ₹15,921 | 10 ₹5,307 Lowest |
| 7.00 | S&F mild steel work as in posts and struts in fencing including cutting top to shape as direct, drilling holes, notching for wire etc,. flat iron fillets (for securing wire mesh etc.) incl all necessary drilling, bolting or reveting,etc and similar work conforming to Fe410-0 or Fe-310-0 all as specified and directed. | 1,187.55 | Kg | 85 ₹1,00,941.75 Lowest | 89 ₹1,05,691.95 | 110 ₹1,30,630.5 | 92 ₹1,09,254.6 | 90 ₹1,06,879.5 |
| 8.00 | S&F for Framed work such as grills, gratings, etc.. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors, gates, ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290.Gde-E-165 all as specified and directed. | 375 | Kg | 110 ₹41,250 | 100 ₹37,500 | 105 ₹39,375 | 92 ₹34,500 | 90 ₹33,750 Lowest |
| 9.00 | Mild steel screw bolts (Machine made) with hexagonal or square heads at one end and screwed the other, or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, exceeding 5 Cm long but not exceeding 10 cm long , 5 to 10mm dia of neck as specified and directed. | 19 | Kg | 90 ₹1,710 Lowest | 135 ₹2,565 | 150 ₹2,850 | 92 ₹1,748 | 120 ₹2,280 |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
27 Sept 2025, 6:00 pmClosed
GE (AF) Hakimpet
Secunderabad
REPAIR TO PATH, KERBS, PAINTING, STORM WATER DRAIN, CULVERT, HARD STANDING BOUNDARY/ SECURITY WALL, FENCING, BARBED WIRE, CONCERTINA COIL AT ORC, BOLTON ROAD AND CAW UNDER GE (AF) HAKIMPET
2025_MES_728547_1
8829/E8
Open Tender
Civil Works
Item Rate
270 days
ORC, CAW BOLTON ROAD
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) Hakimpet
₹70,000
Yes
4 Nov 2025
30 Aug 2025
29 Sept 2025
30 Aug 2025
27 Sept 2025
13 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .