Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | L1 | Accepted-AOC Successful bidder | |
| 2 | L2₹4.7 L+₹49,113 (11.7%)Rejected-Finance 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 | SAHARANPUR | UTTAR PRADESH | 247001 | L2 | Rejected-Finance As not L1 bidder | |
| 3 | L3₹5.2 L+₹99,895 (23.9%)Rejected-Finance DUTTA BAGAN SEN RALEIGH ROAD ASANSOL BARDHAMAN BARDHAMAN 713305 WEST BENGAL INDIA | ASANSOL | BARDHAMAN | WEST BENGAL | 713305 | L3 | Rejected-Finance As not L1 bidder |
Tender Value
₹4.8 L
EMD Value
₹6,000
Closing Date
9 Oct 2023, 11:00 amClosed
A.E.(EandM) Salanpur Area
Office of the GM Salanpur Area, Lalganj, Asansol
Reorganization of 3.3KV overhead line and up gradation and installation of 1MVA, 11KV/3.3KV Transformer at Main sub-station of Bonjemehari Colliery under Salanpur Area.
2023_ECL_289786_1
SLN/GM/EandM/E Tender/23-24/171 Dt.25/09/2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Salanpur Area
Please refer Tender documents.
11 documents required · 11 mandatory
₹6,000
2 Jan 2024
29 Sept 2023
10 Oct 2023
29 Sept 2023
9 Oct 2023
29 Sept 2023
29 Sept 2023 - 3 Oct 2023
Amount
Loading, unloading & transporting of 11/13 Mtr pole to proposed site.
Erection of 11/13 Mtr Long Tubular Pole with concrete foundation.
Supply, fabrication & fitting of different size required MS flat angle, etc for holding insulator at Poles
Drawing of ACSR DOG conductor
Fitting of core & winding from transformer tank after draining out of transformer oil, opening of top cover etc.
Supply of new electrolyte grade copper conductor (Round) for primary coil.
Supply of new electrolyte grade copper conductor (Strip) for secondary coil.
Insulation of bare copper conductor for primary & secondary coils by covering double coated manila paper
Formation of Coil after rewinding of Primary & secondary coil including supply of required insulating materials. (Primary-33 KG + Secondary 240 Kg)
Cost of insulating materials, varnish, Pre-compressed board paper, oil duct, cotton tape, webbing tape etc.
Cost of wooden forma for formation of Primary & Secondary coils.
Providing neoprene gasket of top cover, inspection covr, insulator etc.
Cost of brazing rupaton rod, oxygen, DA for brazing of all the primary & secondary connection.
Fitting of core channel's of Primary & Secondary coils & windings into the transformer tank.
Supply and fixing of new insulator with Cu studs, Cu nuts bolts & washer for secondary side.
Supply & fixing of tap changer switch including mechanism arrangement & alignment with transformer tank.
De-hyderation & filteration of transformer oil.
Instalation of 1 MVA, 11 KV/3.3 KV Transformer at Bonjemehari Colliery which includes placement of transformer, pre commissioning, testing and energized. Details pre-commissioning, testing of transformer: (i) Insulation Resistance test (ii) High Voltage pressure test (iii) Vector group test (iv) Magnetic balance test (v) Voltage ration on all tap position.
Transportation charges both up & down with handling charges.
Less Scrap Value of old unused copper
Provident fund on Labour cost
Total impact of GST for the purpose of CTC
ELECTRO TRADING CO.
JUBILEE ELECTROMECH WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_300116.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .