Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹1.7 L+₹450 (0.26%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹1.7 L+₹1,050 (0.61%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹1.7 L
EMD Value
₹2,000
Closing Date
23 Mar 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
EE, Electy. 400KV S/s Division Sultanpur
Replacement of Pantograph Isolator at 400KV S/s Sultanpur under Electy. 400KV S/s Division Sultanpur
2023_UPTCL_784025_1
S.T. T.No. 11/ESDS/2022-23
Open Tender
Electrical Works
Item Wise
7 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
EE, Electy. 400KV S/s Division Sultanpur
₹2,000
27 Mar 2023
13 Mar 2023
23 Mar 2023
13 Mar 2023
23 Mar 2023
13 Mar 2023
Amount
Complete dismantling of old & used 400KV Pantograph Isolators (AEG make) of 400KV TBC bay (newly 315MVA ICT Bay) A & B Bus (R,Y,& B phase) Ioslator air pressure operated alongwith gear-box assembly, support insulators, operating rod, trapze assembly etc. after opening of 4" IPS pipe bus connectors, disconnecting of earthing strips, disconnection and proper sealing of air pipe line and disconnection of control wiring carefully. The work include safely shifting all the dismantled equipments from switchyard to store and proper stacking as per direction of AE/JE (M). (400KV T.B.C. Bay (newly 315MVA ICT Bay) Bus-A 03 Nos. & Bus-B 03Nos.)
Material shifting from central store to 400KV switchyard and erection of 400KV Pantograph Isolator as per instruction mannual as per technical specification on existing base structure after proper modification to the base (proper cutting & welding as per requirement) to suit the new isolator. The work includes installation of all associate parts and accessories such as support insulators gear box assembly arms, operation rod, MOM boxes and other such accessories as may be required for the proper operation of isolator. Proper care has to be taken during installation to be avoid any damage to any equipment. Laying and termination of control cables for interconnection between R,Y & B Phase and termination of old control cables in control cubicals and marshling box by providing and fixing proper ferrules and lugs as per drawing for proper control and operation of isolator of 400KV T.B.C. Bay (newly 315MVA ICT Bay), Bus-A 03 Nos. & Bus-B 03Nos.
Earthing of newly erected 400KV Pantograph isolator by proper welding of earthing strips provided by the dipartment. The work also includes lifting, cutting and bending of 4" IPS pipe bus conductors to suit the hight of newly erected pantograph and fixing with clamps and connectros properly of 400KV T.B.C. Bay (newly 315MVA ICT Bay), Bus-A 03 Nos. & Bus-B 03Nos.
ELECTRO INDIA
DEEPAK ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .