| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 LAdmitted-Finance | -19.95% | ₹5.2 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 LAdmitted-Finance | -17.02% | ₹5.4 L | L2 | Admitted-Finance |
Tender Value
₹6.5 L
EMD Value
₹12,935
Closing Date
14 Jun 2026, 6:00 pmClosed
EE PHED Division Laxmangarh
Manasi Head Works, Kumas Jatan Road, Laxmangarh
Dismantling of existing RCC OHSR 650 KL Capacity at New Scheme Campus UWSS Fatehpur District Sikar
2026_PHCJA_565145_1
NIT-06/2026-27
Open Tender
Civil Works - Water Works
30 days
Fatehpur
As per Tender Eligibility Criteria
2 documents required · 2 mandatory
₹500
32138-EE PHED Div. Laxmangarh
₹12,935
Yes
19 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
14 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-incharge. | 280 | Cum | 930 | ₹2,60,400 | BI01010001010000000000000515BI0100001118 |
| 2 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer-in-charge | 185 | Sqm | 317 | ₹58,645 | BI01010001010000000000000515BI0100001119 |
| 3 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work | 12,000 | Kg | 2 | ₹24,000 | BI01010001010000000000000515BI0100001120 |
| 4 | Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge: In cement mortar. | 35 | Cum | 641 | ₹22,435 | BI01010001010000000000000515BI0100001121 |
| 5Dismantling CI pipes including excavation and refilling trenches after taking out the pipes, breaking lead caulked joints, melting of lead and making into block, including stacking of pipes lead at site within 50 meter, of dia: | ||||||
| 5.1 | Up to 150mm dia. | 23 | Mtr | 109 | ₹2,507 | BI01010001010000000000000515BI0100001123 |
| 5.2 | Above 150mm dia. up to 300mm dia. | 62 | Mtr | 147 | ₹9,114 | BI01010001010000000000000515BI0100001124 |
| 6 | Carriage of steel up to a lead of 20 Km including loading, Unloading and stacking etc. complete | 12 | MT | 288 | ₹3,456 | BI01010001010000000000000515BI0100001125 |
| 7 | Providing and fixing Barricading at site of work for restricting the general public using 80-100 mm dia Wooden Ballies as vertical post with average pacing of 1.80 meter between two vertical posts, having height at least 1.5 m above road/ ground level and at least 30-45 cm below road/ ground level by making suitable size hole in road/ ground, providing and fixing two rows of 80-100 mm Wooden Ballies as horizontal members with jute russies. Both vertical and horizontal members shall be painted in red and white colour strips as per approved pattern as and when it becomes shabby but at least after every alternate shifting at new location. After shifting/ removal of barricading holes shall be filled up properly and site is to be cleared in all respect. (Note: measurement is to be done in linear basis) | 120 | Meter | 114 | ₹13,680 | BI01010001010000000000000515BI0100001126 |
| 8 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story height made with 40mm dia. M.S. tube 1.5 m centre to centre horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding, | 1,250 | SQM | 202 | ₹2,52,500 | BI01010001010000000000000515BI0100001127 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.30 MB
06_Dismantle_OHSR_UWSS_FTR.pdf
Tender Documents • 1.14 MB
BOQ_1005832.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid