| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC | ₹6.8 L | L1 | Accepted-AOC - |
| 2 | L2₹6.8 LRejected-Finance | ₹6.8 L | L2 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | Lingakumar.P L2 | S. KALYANA SUNDARAVEL L1 |
|---|---|---|---|---|---|
| 1.00Construction of Passanger Shelter at Sippikulam Village Keelavaippar Panchayat | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock, blasting, etc., complete as per standard specification. | 15.63 | cubic meter | 248 ₹3,876.24 | 246 ₹3,844.98 |
| 3.00 | Supplying and filling in foundation and basement with filling excavated earth in larges of not more than 15 cm thick well rammed watered and compacted including & conveyance and all labour charges etc., | 10.8 | cubic meter | 45 ₹486 | 42.5 ₹459 |
| 4.00 | Supplying and filling in basement with filling M-Sand in layer of not more than 15 cm thick well rammed etc., complete. | 2.7 | cubic meter | 1,925 ₹5,197.50 | 1,922 ₹5,189.40 |
| 5.00 | Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification. | 3.61 | cubic meter | 5,660 ₹20,432.60 | 5,652 ₹20,403.72 |
| 6.00 | Brick work in CM 1:5 using country bricks including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification. | 13.06 | cubic meter | 6,040 ₹78,882.40 | 6,039 ₹78,869.34 |
| 7.00 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 43.84 | square meter | 517 ₹26,961.55 | 516 ₹26,909.40 |
| 8.00 | Towards the cost and supply of steel including charges for fabrication and placing in position, etc., complete as per standard specification. | 1.2 | Matric tonne | 1,033 ₹45,286.72 | 1,032 ₹45,242.88 |
| 9.00 | Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification. | 11.79 | square meter | 90,058 ₹1.1 L | 90,057 ₹1.1 L |
| 10.00 | Dadooing of walls with White glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 | 28.8 | square meter | 9,485 ₹1.1 L | 9,482 ₹1.1 L |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
2 Sept 2025, 3:00 pmClosed
Block Devleopment Officer(BP), Vilathikulam
Block Devleopment Office, Vilathikulam
Construction of Passanger Shelter at Sippikulam Village Keelavaippar Panchayat in Vilathikulam Panchayat union of Thoothukudi District Under MLACDS 2025-26
2025_RDTN_596276_1
Construction of Passanger Shelter at Sippikulam Village Keelavaippar
Open Tender
Civil Works
60 days
Vilathikulam Block
AS per Tender schedule
4 documents required · 4 mandatory
₹0
₹7,000
10 Feb 2026
26 Aug 2025
2 Sept 2025
26 Aug 2025
2 Sept 2025
26 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid