| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC NO 71 N1 5TH CROSS ARANI HOUSE ROAD KILODAPPAMUND STONE HOUSE HILL OOTY THE NILGIRIS DISTRICT 643 002 | THE NILGIRIS | TAMIL NADU | 643002 | ₹1.9 Cr Quoted ₹2.0 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.0 Cr+₹2.8 L (1.44%)Rejected-AOC | ₹2.0 Cr+₹2.8 L (1.44%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹2.0 Cr+₹6.2 L (3.17%)Rejected-AOC | ₹2.0 Cr+₹6.2 L (3.17%) | L3 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | M/s. LJK Constructions L1 | VELANKANNI CONSTRUCTION L2 | L DARWIN ANTO DHAS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Installation of Vertical Bored cast in situ RCC piles of 450mm diameter in all types of soils, using Standardised Concrete Mix of M 30 grade with OPC and Crushed Stone Sand and 20mm and down graded HBGS jelly coarse aggregate. The rate includes cost for placing of reinforcement cage in bore hole in correct position, cost of boring to the required depth with Bentonite solution with temprory casing of required length, conveyance of RMC to site and pouring concrete using Tremine pipes, conveyance of all materials to the site including all tools and plants, shifting the plants and equipments from one point to another, excavtion of mud pits for circulation of Bentonite soultion, closing the mud pits to original level and mud removal with initial lead and lift but including dismantling the concrete above the cut off level etc complete as directed by the departmental officers including socketing. The reinforcement cage should be welded properly for lifting. The concrete cubes to be tested as per IS 456- 2000. Acceptance criteria by clause 16.1. Frequency of testing as per 15.2.2. Testing to be conducted at both the ends at site as well as RMC plant. Pile driving depth should be decided by the departmental officers at site. The length of pile for payment shall be measured from top of shoe to the bottom of the pile cap.( Cost of Reinforcement provided for Pile and Welding charges shall be measured and Paid separately ) | 810 | Rm | 3,297 ₹26,70,570 Lowest | 3,348 ₹27,11,880 | 3,405 ₹27,58,050 |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. Upto 2.40m Footing Depth. | 138 | Cu.m | 435 ₹60,030 Lowest | 439 ₹60,582 | 446 ₹61,548 |
| 3.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. - Mixing by manual means. | 10.5 | Cu.m | 8,100 ₹85,050 Lowest | 8,203 ₹86,131.5 | 8,343 ₹87,601.5 |
| 4.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 77.5 | Cu.m | 210 ₹16,275 | 207 ₹16,042.5 Lowest | 211 ₹16,352.5 |
| 5.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 38.5 | Cu.m | 1,740 ₹66,990 Lowest | 1,766 ₹67,991 | 1,797 ₹69,184.5 |
| 6.00 | Supplying and filling in foundation and basement with Filling Crushed Stone Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 25.5 | Cu.m | 2,840 ₹72,420 Lowest | 2,893 ₹73,771.5 | 2,942 ₹75,021 |
| 7.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by manual means. | 26 | Cu.m | 8,100 ₹2,10,600 Lowest | 8,203 ₹2,13,278 | 8,343 ₹2,16,918 |
| 8.00Brick work in Cement Mortar 1:6 (One Cement and six Crushed stone sand) using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for the following including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | ||||||
| 8.01 | For Foundation & Basement | 26.5 | Cu.m | 10,120 ₹2,68,180 Lowest | 10,268 ₹2,72,102 | 10,443 ₹2,76,739.5 |
| 8.02 | For Superstructure in Ground Floor | 42 | Cu.m | 10,250 ₹4,30,500 Lowest | 10,406 ₹4,37,052 | 10,583 ₹4,44,486 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
24 Sept 2025, 3:00 pmClosed
SUPERINTENDING ENGINEER
O/o THE SUPERINTENDING ENGINEER PWD BUILDINGS CONSTRUCTION AND MAINTENANCE CIRCLE COIMBATORE
CONSTRUCTION OF ADDITIONAL DORMITORY ROOMS IN GOVERNMENT SOCIAL JUSTICE HOSTEL-1 (COLLEGE BOYS) AT UDHAGAMANDALAM IN THE NILGIRIS DISTRICT.
2025_PWD_602393_1
36BCMCBE02092025(2)
Open Tender
Civil Works - Buildings
Lump-sum
UDHAGAMANDALAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹1.1 L
24 Nov 2025
13 Sept 2025
24 Sept 2025
13 Sept 2025
24 Sept 2025
13 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .