Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹63.5 LAccepted-Finance | ₹63.5 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹64.3 LRejected-Finance | ₹64.3 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹69.6 LRejected-Finance | ₹69.6 L | L-3 | Rejected-Finance L-3 |
| Sl No | Description | Qty | Unit | S R CONTRACTORS L2 | priyakant L3 | M/S RAGHAV BUILDERS L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork in foundation in dry soil i/c lift upto 1.50m and lead upto 30m including back filling, watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal disposal of surplus earth as directed by engineer in charge up to 30 meter lead from the foundation. | 151.2 | Cum | 60 ₹9,072 | 82 ₹12,398.4 | 70 ₹10,584 |
| 2.00 | uprooting jhunds and moonj disposal away from site. | 845.2 | Sqm | 5 ₹4,226 | 30 ₹25,356 | 25 ₹21,130 |
| 3.00 | Clearing thick bushes and thorny jungle without uprooting | 1,690.4 | Sqm | 4 ₹6,761.6 | 4.4 ₹7,437.76 | 3.4 ₹5,747.36 |
| 4.00 | Earthwork in filling in ordinary soil i/c lead upto 200 m and lift upto 1.50 m with ramming and dressing etc. directed by engineer in charge. | 1,618 | Cum | 150 ₹2,42,700 | 110 ₹1,77,980 | 115 ₹1,86,070 |
| 5.00 | Providing and Laying C.C 1:3:6 (M-10) in foundation & floor including cost of material, labour and T&P | 27.53 | Cum | 4,500 ₹1,23,885 | 5,000 ₹1,37,650 | 4,415 ₹1,21,544.95 |
| 6.00 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material within a distance of 60M as per direction of Engineer in charge. | 155.54 | Cum | 380 ₹59,105.2 | 388 ₹60,349.52 | 390 ₹60,660.6 |
| 7.00 | Dismantling existing Plaster including disposal of refuse within a distance of 60M. | 888.71 | Sqm | 25 ₹22,217.75 | 25 ₹22,217.75 | 20 ₹17,774.2 |
| 8.00 | M-150 Brick work in 1:4 C.M including all cost of material labour and T&P etc complete | 283.81 | Cum | 5,200 ₹14,75,812 | 4,650 ₹13,19,716.5 | 4,260 ₹12,09,030.6 |
| 9.00 | Centering and shuttering of R.C.C work including all cost of material, labour and T&P | 1,060.8 | Sqm | 430 ₹4,56,144 | 600 ₹6,36,480 | 600 ₹6,36,480 |
| 10.00 | Steel reinforcement including bending, Binding, Cutting, Placing of reinforcement Material, Labour and T&P | 13.99 | MT | 67,000 ₹9,37,330 | 66,805 ₹9,34,601.95 | 61,500 ₹8,60,385 |
Tender Value
₹84.3 L
EMD Value
₹1.7 L
Closing Date
21 May 2026, 3:00 pmClosed
S.E.Drainage Circle. Aligarh
Office Of S.E.Drainage Circle. Aligarh
Renovation of Makhena I.H Located at Anoopshahar Branch and Re-Construction of Boundary wall for the Security of the Makhena I.H.
2026_UPIDC_1146623_1
02/SE/DCA/2026-27
Open Tender
Civil Works - Buildings
180 days
BULANDSHAHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,788
₹1.7 L
Aligarh
1 Jul 2026
16 May 2026
21 May 2026
16 May 2026
21 May 2026
16 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in foundation in dry soil i/c lift upto 1.50m and lead upto 30m including back filling, watering and ramming of excavated earth into the structure and the sides of foundation trenches or into the plinth with removal and disposal disposal of surplus earth as directed by engineer in charge up to 30 meter lead from the foundation. | 151.2 | Cum | - | - |
| 2 | uprooting jhunds and moonj disposal away from site. | 845.2 | Sqm | - | - |
| 3 | Clearing thick bushes and thorny jungle without uprooting | 1,690.4 | Sqm | - | - |
| 4 | Earthwork in filling in ordinary soil i/c lead upto 200 m and lift upto 1.50 m with ramming and dressing etc. directed by engineer in charge. | 1,618 | Cum | - | - |
| 5 | Providing and Laying C.C 1:3:6 (M-10) in foundation & floor including cost of material, labour and T&P | 27.53 | Cum | - | - |
| 6 | Dismantling brick work or stone work and cement concrete in cement mortar and including stacking of material within a distance of 60M as per direction of Engineer in charge. | 155.54 | Cum | - | - |
| 7 | Dismantling existing Plaster including disposal of refuse within a distance of 60M. | 888.71 | Sqm | - | - |
| 8 | M-150 Brick work in 1:4 C.M including all cost of material labour and T&P etc complete | 283.81 | Cum | - | - |
| 9 | Centering and shuttering of R.C.C work including all cost of material, labour and T&P | 1,060.8 | Sqm | - | - |
| 10 | Steel reinforcement including bending, Binding, Cutting, Placing of reinforcement Material, Labour and T&P | 13.99 | MT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Tendernotice_2.pdf
PDF • 2.96 MB
BOQ_2144426.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid