Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.3 L+₹8,362.50 (6.68%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.3 L+₹8,695.66 (6.95%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 L
EMD Value
₹4,014
Closing Date
27 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
C/O ROAD WITH P/BUND NGO QASIM WAGAY AT K-HALLAN 632
2026_RDPR_320338_29
e- NIT No. 64 OF REWK/PRI/2026-27 Dated 10-08-2026
Open Tender
Civil Works
Percentage
40 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
EX ENGINEER REW KULGAM
₹4,014
Yes
5 Sept 2026
11 Aug 2026
31 Aug 2026
11 Aug 2026
27 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearance by way of engagement of labours i/c removing rubbish, garbage etc | - | sqm | - | - |
| 0.0 | PROVIDING AND LAYING OF RIVER BED MATERIAL /NALLAH MUCK ON SURFACES STONE SIZES I/C SPREADING TO TEMPLATE AND CONSOLIDATION WITH POWER ROLLER 8-10 TONNS CAPACITY | - | cum | - | - |
| 0.0 | SUPPLYING LAYING SPREADING STONE AGGREGATES OF 63MMTO 45MM SIZE C.J | - | cum | - | - |
| 0.0 | Earthwork in excavation in trenches for foundation including disposal of excavated material within normal lead and lift. | - | cum | - | - |
| 0.0 | Providing and laying of dry stone solling hand packed nallah stone boulders in foundation | - | cum | - | - |
| 0.0 | Providing and laying in position cement concrete 1:3:6 of specified grade using 20mm nominal size aggregates. | - | cum | - | - |
| 0.0 | P/F of shuttering/centering | - | sqm | - | - |
| 0.0 | Carriage of aggregates by mt 20 kms @90% concrete only | 1 | cum | - | - |
| 0.0 | Carriage of aggregates by mt 20 kms @45% concrete only | 1 | cum | - | - |
| 0.0 | Provision for signboard & photographs | - | job | 0.2 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1064678.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .