| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.5 Cr+₹21.3 L (9.16%)Rejected-AOC | ₹2.5 Cr+₹21.3 L (9.16%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | - | - | Rejected-Technical UNQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical UNQUALIFIED |
| 5 | Rejected-Technical 0 BARAGOAN JANGIGANJ BHADOHI SANT RAVIDAS NAGAR UTTAR PRADESH 221310 | BHADOHI | UTTAR PRADESH | 221310 | - | - | Rejected-Technical UNQUALIFIED |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
26 Sept 2022, 2:00 pmClosed
SE IWC SRE
OFFICE OF THE SE IWC SRE
Construction of Pucca Channel from km. 9.500 to km. 10.500 and Repair/Reconstruction of Pucca Work of Randhoul DY. in District Saharanpur
2022_UPIDC_729666_1
02/SE/SRE/2022-23
Open Tender
Civil Works
Item Rate
180 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.9 L
7 Nov 2022
20 Sept 2022
27 Sept 2022
20 Sept 2022
26 Sept 2022
20 Sept 2022
Amount
E/w in Excavation for foundation of wall i/c lead up to 30m & lift up to 1.50m i/c all cost of material, labour, t&p etc complete.
E/w in Filling for Restoration of Bank i/c lead up to 2.00 km & lift up to 1.50 m i/c all cost of material, labour, t&p etc complete.
Ist Class Brick work in 1:4 Cement mortar i/c all cost of material, labour, t&p etc complete.
Cement Pointing (Struck Deep) on Brick masonry in 1:2 C.M. i/c all cost of material, labour, t&p etc complete.
Supply & Laying of C.C. 1:3:6 with stone ballast size 10mm to 20 mm i/c all cost of labour , material T&P etc But excluding the cost of centring & shuttering and reinforcement complete.
Centring & shuttering for R.C.C. work i/c cost of material, labour, t&P etc Complete.
Supply & Laying of Cement Concrete in 1:2:4 with stone ballast size 10mm to 20 mm i/c all cost of labour , material T&P etc But excluding the cost of centring & shuttering complete.
Providing & Fixing of Thermocoal Sheet 25mm Thick i/c all cost of material, labour, t&p etc complete.
Supply & Laying P.V.C. Seal 6 inch wide in Exp. Joints i/c all cost of material, labour, t&p etc complete.
Laying Boulder Pitching with 20 to 40 kg Dry Boulder i/c all cost of material, labour, t&p etc complete.
C.C. Grouting in 1:3:6 over dru boulder pitching i/c all cost of material, labour, t&p etc complete.
Laying Brick on Edge i/c all cost of material, labour, t&p etc complete.
Supply & Fixing 6 Inches Pipe in Outlet at different location as required at site i/c all cost of material, labour, t&p etc complete.
12.50 mm Thick Cement Plaster 1:3 on Brick work i/c all cost of material, labour, t&p etc complete.
Supply & Laying of Cement Concrete with stone ballast size 10mm to 20mm in C.C. work (1:1½:3) i/c all cost of labour , material T&P etc But excluding the cost of centring & shuttering and reinforcement complete.
Supply & Laying of Cement concrete with stone ballast size 10mm to 20mm in R.C.C. work (1:1½:3) i/c all cost of labour , material T&P etc But excluding the cost of centring & shuttering and reinforcement complete.
Supply & Laying Steel Reinforcement i/c all cost of labour , material T&P i/c cutting, bending, binding etc complete.
Supply & Laying Drainage PVC Pipe 110 mm dia i/c all cost of material, labour T&P etc
R.R. Stone Masonery in C.M. 1:4 i/c all cost of material, labour, t&p etc complete.
M/S Construction Gallery
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .