| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance | ₹1.1 Cr | L1 | Accepted-Finance In order |
| 2 | L2₹1.1 CrRejected-Finance | ₹1.1 Cr | L2 | Rejected-Finance Not in order |
| 3 | L3₹1.1 CrRejected-Finance 3077 SECTOR 28 D CHANDIGARH | ₹1.1 Cr | L3 | Rejected-Finance Not in order |
| 4 | L4₹1.2 CrRejected-Finance UDYOG PATH U T CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.2 Cr | L4 | Rejected-Finance Not in order |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
19 Aug 2026, 12:00 pmClosed
Executive Engineer Roads Division No 2 MC Chd
Executive Engineer Roads Division No 2 MC Chd
RE-CARPETING OF VARIOUS ROAD UNDER JURISDICTION OF ROAD SUB DIVISION NO. 5 M.C, CHANDIGRH (SUB WORK - V-4 ROAD SECTOR 29 AND V-6 ROAD SECTOR 27 A, CHANDIGARH)
2026_MCC_94696_1
2026/R2/140
Open Tender
Civil Works
Percentage
120 days
work
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹2.6 L
31 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and applying tack coat using hot straight run bitumen of grade VG-10 Bulk @ 3 Kg per 10 Sqm including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surfaceas per clause 503 of MORT&H specifications. complete in all respects to the entire satisfaction of Engineer In-charge. | 21,974.65 | Sqm | 34 | ₹7,47,138.1 |
| 2 | Providing and laying 30 thick Bituminous Concrete with 100/120 TPH batch type Hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specific grading-II with Bituminous binder @ 5.5%(by wt. of total mix) laying with hyrostatic paver finisher with sensor control to required grade level and allignment, rolling with smooth wheeled vibrator and tendom rollers to achive the desire compaction as per MORT&H specification Clause 509 complete in all respect (5th revision). | 10,761.08 | Sqm | 512 | ₹55,09,672.96 |
| 3 | Providing and laying 35 thick Bituminous Concrete with 100/120 TPH batch type Hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specific grading-II with Bituminous binder @ 5.5%(by wt. of total mix) laying with hyrostatic paver finisher with sensor control to required grade level and allignment, rolling with smooth wheeled vibrator and tendom rollers to achive the desire compaction as per MORT&H specification Clause 509 complete in all respect (5th revision). | 11,213.57 | Sqm | 597 | ₹66,94,501.29 |
| 4 | Providing and applying 2.5mm thick road marking strips (retro-reflective) of specifñad shade colour using not material by fully semi thermoplastic automatic thermoplastic paint applicator machine fitted with profile shoe glass beads dispenser, propane tank heater and proffle shoe heater, driven by experienced operator on road surface including cost of material surface labour T&P, cleaning the road dirt, seals oil, grease foreign material etc complete as direction Engineer-in-charge and accordance with applicable specifications. (DSR 18.62) | 280.34 | Sqm | 686 | ₹1,92,313.24 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.92 MB
BOQ_116185.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].