Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.8 LAccepted-AOC CHAR GHOSHHAT FROM RANJIT HAWLADER HOUSE OF BIMAL DEBNATH HOUSE WARD NO 11 UNDER KATWA MUNICIPALITY WEST BENGAL | L1 | Accepted-AOC Accept | |
| 2 | L2₹25.9 L+₹5,714.64 (0.22%)Rejected-AOC BARDHAMAN | WEST BENGAL | 713364 | L2 | Rejected-AOC Reject | |
| 3 | L3₹26.0 L+₹11,689.03 (0.45%)Rejected-Finance KATWA WEST BENGAL | L3 | Rejected-Finance Reject |
Tender Value
₹26.0 L
EMD Value
₹51,951
Closing Date
20 Mar 2026, 5:00 pmClosed
CHAIRMAN KATWA MUNICIPALITY
CHAIRMAN KATWA MUNICIPALITY
Construction of Warehouse for Sanitary Department Near Water Treatment Plant Beside Subodh Shriti Road ward no-12, under Katwa Municipality, Katwa, Purba Bardhaman under 15th Finance Commission Tied Grant
2026_MAD_1019694_9
WBMAD 96 (DEV/15TH F.C./KM)2025-2026
Open Tender
CIVIL WORKS
Percentage
35 days
Water Treatment Plant Beside Subodh Shriti Road
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹51,951
Yes
1 Sept 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
20 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, leveling, and dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm SOR PWD (BUILDING) PAGE NO :- 1 , ITEM NO :- 2 (a), | 100.01 | % M3 | 11,927 | ₹11,92,819.27 |
| 2 | Earth work in filling in foundation trenches or plinth
with good earth, in layers not exceeding 150 mm.
including watering and ramming etc. layer by layer
complete. (Payment to be made on the basis of
measurement of finished quantity of work)(a) With earth obtained from excavation of foundation. SOR PWD (BUILDING) PAGE NO :- 1 , ITEM NO :- 2 (a), | 20 | % M3 | 7,754 | ₹1,55,080 |
| 3 | (A) Filling in foundation trenches or plinth with silver sand in layer not exceeding 150 mm as directed and consolidating same by through saturation with water ramming complete including the cost of supply of sand (Payment to be made on measurement of finished quantity of work). SOR, PWD (BUILDING), PAGE NO :- 2 , ITEM NO :- 4 A | 110.92 | % M3 | 64,086 | ₹71,08,419.12 |
| 4 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor
as per relevant IS codes. a) Pakur Variety SOR, PWD (BUILDING), 3RD CORRIGENDA, PAGE NO:-24, ITEM NO :- 4 | 32.93 | M3 | 5,107.93 | ₹1,68,204.13 |
| 5 | Brick work with 1st class bricks in cement mortar (1:6) (a) In foundation and plinth B.S. ITEM NO -08, Page- 15 | 7.32 | M3 | 4,812 | ₹35,223.84 |
| 5.1 | b) Superstructure (1:6) | 47.92 | M3 | 5,035 | ₹2,41,277.2 |
| 6 | Plaster (to wall, floor, ceiling etc) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface including throating nosing and drip course where necessy. (i) With 1:4 cement mortar. 15 mm thick plaster. In Ground Floor RATE ANALYSIS ENCLOSED | 387.35 | M2 | 152 | ₹58,877.2 |
| 7 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc. NOTE:Cement 0.152 cu.m per100 sq.m. B.S. ITEM NO -15, Page- 192 | 32.4 | M2 | 34 | ₹1,101.6 |
| 8 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. B.S. ITEM NO -36 C, Page- 42, | 173.76 | M2 | 363 | ₹63,074.88 |
| 9 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after
completion of works (upto roof of ground floor). (f) 25 mm to 30 mm shuttering without staging in foundation SOR, PWD (BUILDING), PAGE NO:-42, ITEM NO :- 36(f) | 48.32 | M2 | 205 | ₹9,905.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
2911FORM.pdf
Tender Documents • 1.48 MB
BOQ_2506950.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .