Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
12 Dec 2022, 2:30 pmClosed
SE/GEDC/GOBI
SE/GEDC/GOBI
Works contract for HT/LT line works at West Bhavani Subdivison
2022_EB_268033_1
ET No.45 dt 23.11.2022
Open Tender
Electrical and Maintenance Works
Works
30 days
GOBI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,000
Yes
13 Dec 2022
25 Nov 2022
13 Dec 2022
25 Nov 2022
12 Dec 2022
25 Nov 2022
Amount
Excavation of pole pit up to 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8mtr pole PSC/RCC/RSJ pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Dismantling of PSC/RCC /Metal poles upto 8.00m. (27') by using JCB or manual
Erection of PSC/RCC /Metal poles above 8.0m.(27') by using JCB or maual
Dismantling of PSC/RCC poles/Metal poles above 8.0m.(27') by using JCB or maual
Erection of stay set complete
Fixing of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Dismantling of HT "V" cross arms(all types) / channel cross arms/guarding Cross arms
Fixing of LT 3 phase cross arms
Dismantling of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Dismantling of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Dismantling of HT/LT TI Fittings
Fixing of Aluminium Knob
Dismantling of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Dismantling of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Dismantling of HT 22 KV strain disc.
Fixing of LT pin Insulator
Dismantling of LT pin Insulator
Fixing of LT shackle
Dismantling of LT shackle
Paving of conductor , stringing etc of ACSR 7/4.09 mm Raccoon conductor
Dismanting of ACSR 7/4.09 mm Raccoon conductor
Paving of conductor , stringing etc ACSR 7/3.35mm /AAAC 3.15mm Rabbit conductor
Dismanting of ACSR 7/3.35mm /AAAC 3.15mm Rabbit conductor
Paving of conductor , stringing etcofACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor
Dismanting of ACSR7/2.59mm /AAAC 2.50 mm weasel and ACSR7/2.11 mm conductor
Sleeve concreting including materials (Cement 1/2 bag + river sand/M-sand and Blue metals and watering)
Earthing of pole with coil earthing including burying looping and binding
Replacement of earthing of pole with coil earthing including burying looping binding
Transporting of poles / materials / conductor and other materials below 8.0 km (plains) only one direction ie no return charge (excluding loading and unloading charges )
Above 8.0 kms for additional km (Irrespective of weight in tonnage and single direction ie no return charge)
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road site to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading of poles upto 8.0 mtr / 27'
Un Loading of poles upto 8.0 mtr / 27'
Loading of poles above 8.0 m pole
Un Loading of poles above 8.0 m pole
loading of materials
Un loading of materials
Leading and stacking of materials
Loading or unloading of Transformer upto 100 KVA for each
Loading or unloading of Transformer above 100 KVA and upto 200 KVA for each
Erection of New Transformer all capacity (wiht jumbering)
Drilling of hole in Channel only 3/4" &1"
Cutting of angle
Re-sagging of ACSR 7/3.35 mm / AAAC 3.15 mm Rabbit conductor
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm conductor
Releasing of ACSR /AAAC conductor from condutor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 mm
Erection of Street light including fixure fitting
Fixing of new CFL / LED lamp fittings
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Cutting of coconut leaves (per tree)
Erection of Transformer strucure complete in all respects with wiring, earthing,fixing of open type fuse units, HT/LT LAS and jumpeing 3 No's. Earth pits with coller including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting. (Except erection of Transfomer
Erection of Transformer, strucure complete in all respects with wiring, earthing,fixing of open type fuse units, HT/LT LAS and jumpeing 3 No's. Earth pits with coller including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle excluding concreting. (Except erection of Transfomer
Erection of Single pole strucure complete in all respects with wiring, earthing,fixing of open type fuse units, HT/LT LAS and jumpeing 3 No's. Earth pits with coller including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting. (Except erection of Transfomer)
Erection of Single pole strucure complete in all respects with wiring, earthing,fixing of open type fuse units, HT/LT LAS and jumpeing 3 No's. Earth pits with coller including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure excluding concreting. (Except erection of Transfomer)
Erection of D.P.Structure with AB switch, top channel, cross bracing, earthing, painting, providing stay excluding concreing
KSMANDCO
stage.html
html • 0.02 MB
finance_317833.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .