Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC GANGASAGAR PO SAGAR | ₹3.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.9 LRejected-Finance AMODPUR HATTALA BIRBHUM PS SAINTHIYA BIRBHUM 731201 | SAINTHIA | BIRBHUM | WEST BENGAL | 731201 | ₹3.9 L | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹4.1 LRejected-Finance 00 DEY ENTERPRISE SODEPUR 9 10 PITS COLLIERY ASANSOL BARDHAMAN WEST BENGAL 713372 UDYAM WB 23 0013338 | PASCHIM BARDHAMAN | WEST BENGAL | 713372 | ₹4.1 L | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | MS BABUSONA ENTERPRISE H3 | DEY ENTERPRISE H1 | M/S UTTAM KUMAR CHATTERJEE H2 |
|---|---|---|---|---|---|---|
| 1.00N.B:-All Quoted Rates are inclusive of GST @ 18% + CESS @ 1% | ||||||
| 2.00 | Technician Charges for fitting-fixing of geared operated motors (dept.) at the basement support of the lighting towers including all electrical connection complete as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units) | 14 | Units | 690 ₹9,660 | 790 ₹11,060 | 760 ₹10,640 |
| 3.00 | Carrying and positioning of Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to site i.e. different zone at Mela ground by hiring of car and all other necessary arrangement as per requirement including and unloading complete[Period - 03-01-2026 to 16-01-2026] | 14 | Units | 6,130 ₹85,820 | 7,240 ₹1.0 L | 6,500 ₹91,000 |
| 4.00 | Fitting fixing of the luminaries (8 Nos.) on the lighting tower and laying of the 10 Sq. mm. PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. [cable will be supplied by the department] | 14 | Units | 12,265 ₹1.7 L | 12,760 ₹1.8 L | 12,530 ₹1.8 L |
| 5.00 | Carrying back the Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Sagar by hiring of car and all other necessary arrangement after completion of Mela including and unloading complete | 14 | Units | 6,130 ₹85,820 | 7,240 ₹1.0 L | 6,500 ₹91,000 |
| 6.00 | Guarding arrangement of the whole installation round the clock as per direction of the EIC [14 days] | 14 | Days | 691 ₹9,674 | 720 ₹10,080 | 700 ₹9,800 |
| 7.00 | Technician Charges for dismentling of geared operated motors (dept.) at the basement support of the lighting towers including all electrical disconnection complete and returned to site store as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units) | 14 | Days | 690 ₹9,660 | 790 ₹11,060 | 760 ₹10,640 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
19 Nov 2025, 10:00 amClosed
Executive Engineer SMD PHE Dte
Chetla
As per NIeT documents in connection with Ganga Sagar Mela 2026
2025_PHED_926249_17
WBPHE/EE/SMD/NIeT-39 of 2025-26
Open Tender
Electrical Work/ Equipment
60 days
Ganga Sagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,000
7 Apr 2026
1 Nov 2025
21 Nov 2025
1 Nov 2025
19 Nov 2025
1 Nov 2025
Amount
Technician Charges for fitting-fixing of geared operated motors (dept.) at the basement support of the lighting towers including all electrical connection complete as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units)
Carrying and positioning of Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to site i.e. different zone at Mela ground by hiring of car and all other necessary arrangement as per requirement including and unloading complete[Period - 03-01-2026 to 16-01-2026]
Fitting fixing of the luminaries (8 Nos.) on the lighting tower and laying of the 10 Sq. mm. PVC insulated Aluminium Armoured cable with all interconnection complete with testing of the same as per direction of the EIC. [cable will be supplied by the department]
Carrying back the Telescopic tilting type lighting tower including control panel, cable, luminaries etc. to PHE store after dismantling the luminaries, accessories, cable etc. at Sagar by hiring of car and all other necessary arrangement after completion of Mela including and unloading complete
Guarding arrangement of the whole installation round the clock as per direction of the EIC [14 days]
Technician Charges for dismentling of geared operated motors (dept.) at the basement support of the lighting towers including all electrical disconnection complete and returned to site store as per direction of EIC ( 2 nos motors in each 10 units and 3 nos motors each of 2 units)
M/S UTTAM KUMAR CHATTERJEE (BID ID -7353208)
MS BABUSONA ENTERPRISE (BID ID -7342095)
stage.html
html • 0.05 MB
technical_2197169.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.24 MB
Tendernotice_2.pdf
PDF • 0.45 MB
Tendernotice_3.pdf
PDF • 1.00 MB
BOQ_2197169.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid