Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAccepted-Finance | ₹2.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹2.4 LAccepted-Finance | ₹2.4 L | L2 | Accepted-Finance L2 |
| 3 | L3₹2.4 LAccepted-Finance | ₹2.4 L | L3 | Accepted-Finance L3 |
Tender Value
₹2.3 L
EMD Value
₹4,610
Closing Date
13 Feb 2026, 6:55 pmClosed
Pradhan
office of the pradhan Ghoom Khasmal gram panchayat
CONSTRUCTION OF DRAIN FROM ROSHAN DEWAN HOUSE TO SHYAM SINGH HOUSE VIA RAJESH SINGH HOUSE ,PUSSIMBING SANSAD NO VIII UNDER GHOOM KHASMAL GP WITHIN JOREBUNGLOW SUKHIA POKHARI DEV BLOCK.
2026_GTA_997627_1
08/16th CFC/Pradhan/Ghoom Khasmal G.P.
Open Tender
CIVIL WORKS
Ghoom Khasmahal
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
₹4,610
Yes
28 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
Plum Concrete work with 40 % Cement Concrete with 30 mm down graded stone metal and 60% stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
Ordinary cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
1% Labour Welfare Cess
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
Tendernotice_2.pdf
PDF • 0.54 MB
BOQ_2442684.xls
BOQ • 0.23 MB
NIT02FEB.pdf
Tender Documents • 0.66 MB
sbd2FEB.pdf
Additional Documents • 0.52 MB
Download all tender documents and submit your bid