Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.6 LAdmitted-Finance | ₹48.6 L | L1 | Admitted-Finance |
| 2 | L2₹58.3 L+₹9.7 L (19.9%)Admitted-Finance | ₹58.3 L+₹9.7 L (19.9%) | L2 | Admitted-Finance |
| 3 | L3₹58.8 L+₹10.1 L (20.8%)Admitted-Finance 60 4 MOTILAL GUPTA ROAD KOL 700008 | KOLKATA | WEST BENGAL | 700008 | ₹58.8 L+₹10.1 L (20.8%) | L3 | Admitted-Finance |
| 4 | L4₹59.2 L+₹10.6 L (21.7%)Admitted-Finance | ₹59.2 L+₹10.6 L (21.7%) | L4 | Admitted-Finance |
| 5 | L5₹65.9 L+₹17.2 L (35.4%)Admitted-Finance | ₹65.9 L+₹17.2 L (35.4%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SURESH KUMAR AND SONS L1 | NATNOO CONSTRUCTION L10 | Rashid Ashraf Wani L23 | BILAL ASHRAF MINTOO L2 | Ghulam Mohd Sheikh L21 | Mohd Shafi Zargar L5 | M/S MINTOO CONSTRUCTIONS L20 | M/S ZARGAR CONSTRUCTION CO L17 | MUSHTAQ AHMED RATHER L13 | M/s Raj Construction & Co. L3 | MAQBOOL HUSSAIN L8 | Bilal Ahmed Malik L19 | RIYAZ AHMED MALIK L14 | Javeed Iqbal Ahanger L16 | ab rashid lone L22 | SHRI KHALID HUSSAIN SHEIKH L4 | GULAM ABASS LONE L7 | MANZOOR AHMED NATNOO L24 | farooq ahmed kripak L9 | M/S MB Constructions Through Prop. L18 | M/S ALTAF HUSSAIN MINTOO AND CO L6 | MALIK CONSTRUCTION CO L11 | SHABIR AHMED L12 | jalal ud din lone L15 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge | |||||||||||||||||||||||||||
| 1.10 | All kinds of soil. | 15,506.4 | cum | 130 ₹20,15,832 | 144 ₹22,32,921.6 | 157 ₹24,34,504.8 | 90 ₹13,95,576 Lowest | 210 ₹32,56,344 | 160 ₹24,81,024 | 147 ₹22,79,440.8 | 150 ₹23,25,960 | 230 ₹35,66,472 | 98 ₹15,19,627.2 | 150 ₹23,25,960 | 119 ₹18,45,261.6 | 150 ₹23,25,960 | 130 ₹20,15,832 | 160 ₹24,81,024 | 150 ₹23,25,960 | 140 ₹21,70,896 | 250 ₹38,76,600 | 161 ₹24,96,530.4 | 159 ₹24,65,517.6 | 110 ₹17,05,704 | 190 ₹29,46,216 | 180 ₹27,91,152 | 190 ₹29,46,216 |
| 1.20 | Ordinary Rock | 6,645.6 | cum | 160 ₹10,63,296 | 207 ₹13,75,639.2 | 327 ₹21,73,111.2 | 180 ₹11,96,208 | 210 ₹13,95,576 | 170 ₹11,29,752 | 267 ₹17,74,375.2 | 220 ₹14,62,032 | 250 ₹16,61,400 | 130 ₹8,63,928 Lowest | 210 ₹13,95,576 | 230 ₹15,28,488 | 150 ₹9,96,840 | 269 ₹17,87,666.4 | 360 ₹23,92,416 | 150 ₹9,96,840 | 180 ₹11,96,208 | 270 ₹17,94,312 | 199 ₹13,22,474.4 | 316.5 ₹21,03,332.4 | 200 ₹13,29,120 | 280 ₹18,60,768 | 200 ₹13,29,120 | 350.5 ₹23,29,282.8 |
| 1.30 | Hard Rock (Blasting Prohibited) | 2,215.2 | cum | 190 ₹4,20,888 Lowest | 333 ₹7,37,661.6 | 939 ₹20,80,072.8 | 425 ₹9,41,460 | 400 ₹8,86,080 | 230 ₹5,09,496 | 990 ₹21,93,048 | 420 ₹9,30,384 | 400 ₹8,86,080 | 358 ₹7,93,041.6 | 280 ₹6,20,256 | 390 ₹8,63,928 | 500 ₹11,07,600 | 777 ₹17,21,210.4 | 910 ₹20,15,832 | 200 ₹4,43,040 | 490 ₹10,85,448 | 400 ₹8,86,080 | 290 ₹6,42,408 | 555 ₹12,29,436 | 300 ₹6,64,560 | 300 ₹6,64,560 | 235 ₹5,20,572 | 551 ₹12,20,575.2 |
| 2.00Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. | |||||||||||||||||||||||||||
| 2.10 | Beyond 30 cm girth upto and including 60 cm girth. | 712 | each | 100 ₹71,200 | 252 ₹1,79,424 | 352.18 ₹2,50,752.16 | 150 ₹1,06,800 | 150 ₹1,06,800 | 101 ₹71,912 | 303 ₹2,15,736 | 200 ₹1,42,400 | 5 ₹3,560 Lowest | 60 ₹42,720 | 179 ₹1,27,448 | 705 ₹5,01,960 | 200 ₹1,42,400 | 273 ₹1,94,376 | 430 ₹3,06,160 | 100 ₹71,200 | 200 ₹1,42,400 | 850 ₹6,05,200 | 400 ₹2,84,800 | 293 ₹2,08,616 | 800 ₹5,69,600 | 100 ₹71,200 | 200 ₹1,42,400 | 49 ₹34,888 |
| 3.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | 42,248 | sqm | 2.5 ₹1,05,620 | 9 ₹3,80,232 | 10 ₹4,22,480 | 7 ₹2,95,736 | 19.94 ₹8,42,425.12 | 5 ₹2,11,240 | 9 ₹3,80,232 | 15 ₹6,33,720 | 0.1 ₹4,224.8 Lowest | 12 ₹5,06,976 | 5 ₹2,11,240 | 50 ₹21,12,400 | 7 ₹2,95,736 | 10 ₹4,22,480 | 12 ₹5,06,976 | 6 ₹2,53,488 | 5 ₹2,11,240 | 2 ₹84,496 | 21 ₹8,87,208 | 9.65 ₹4,07,693.2 | 10 ₹4,22,480 | 10 ₹4,22,480 | 16 ₹6,75,968 | 10 ₹4,22,480 |
| 4.00 | Dry random rubble masonry with hard stonein foundations and plinth | 734.4 | cum | 1,050 ₹7,71,120 Lowest | 2,700 ₹19,82,880 | 2,333 ₹17,13,355.2 | 1,550 ₹11,38,320 | 3,750 ₹27,54,000 | 1,899 ₹13,94,625.6 | 2,285 ₹16,78,104 | 3,500 ₹25,70,400 | 2,000 ₹14,68,800 | 1,900 ₹13,95,360 | 2,400 ₹17,62,560 | 2,500 ₹18,36,000 | 3,400 ₹24,96,960 | 1,600 ₹11,75,040 | 2,149 ₹15,78,225.6 | 1,600 ₹11,75,040 | 1,600 ₹11,75,040 | 3,000 ₹22,03,200 | 1,600 ₹11,75,040 | 2,002 ₹14,70,268.8 | 2,250 ₹16,52,400 | 1,800 ₹13,21,920 | 2,300 ₹16,89,120 | 1,100 ₹8,07,840 |
| 5.00 | Making bunds by way of filling earth in layers including watering and compacting each layer and dressing etc. complete | 1,107.6 | cum | 34 ₹37,658.4 | 180 ₹1,99,368 | 373 ₹4,13,134.8 | 130 ₹1,43,988 | 180 ₹1,99,368 | 101 ₹1,11,867.6 | 371 ₹4,10,919.6 | 250 ₹2,76,900 | 100 ₹1,10,760 | 130 ₹1,43,988 | 150 ₹1,66,140 | 300 ₹3,32,280 | 190 ₹2,10,444 | 500 ₹5,53,800 | 191.01 ₹2,11,562.68 | 10 ₹11,076 Lowest | 400 ₹4,43,040 | 50 ₹55,380 | 80 ₹88,608 | 500 ₹5,53,800 | 300 ₹3,32,280 | 100 ₹1,10,760 | 200 ₹2,21,520 | 80 ₹88,608 |
| 6.00Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering - All work up to plinth level : | |||||||||||||||||||||||||||
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
1 Jul 2024, 4:00 pmClosed
Estates Officer
Estates Division, SKUAST-J, Main Campus, Chatha
Land levelling and other allied works in the newly acquired farm land at Village Dedpeth, KVK Kishtwar
2024_SKUST_250241_10
AU/Estates/2024-25/02 dated 05-06-2024
Open Tender
Civil Works
Item Rate
360 days
KVK Kishtwar
Please refer tender doucments
4 documents required · 4 mandatory
₹3,000
Assistant Comptroller Estates SKUAST Jammu
₹2.4 L
23 Jul 2024
14 Jun 2024
2 Jul 2024
14 Jun 2024
1 Jul 2024
14 Jun 2024
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge
All kinds of soil.
Ordinary Rock
Hard Rock (Blasting Prohibited)
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
Beyond 30 cm girth upto and including 60 cm girth.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared
Dry random rubble masonry with hard stonein foundations and plinth
Making bunds by way of filling earth in layers including watering and compacting each layer and dressing etc. complete
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
BILAL ASHRAF MINTOO
M/s Raj Construction & Co.
SHRI KHALID HUSSAIN SHEIKH
Mohd Shafi Zargar
M/S ALTAF HUSSAIN MINTOO AND CO
GULAM ABASS LONE
MAQBOOL HUSSAIN
farooq ahmed kripak
NATNOO CONSTRUCTION
MALIK CONSTRUCTION CO
SHABIR AHMED
MUSHTAQ AHMED RATHER
RIYAZ AHMED MALIK
jalal ud din lone
Javeed Iqbal Ahanger
M/S ZARGAR CONSTRUCTION CO
M/S MB Constructions Through Prop.
Bilal Ahmed Malik
M/S MINTOO CONSTRUCTIONS
Ghulam Mohd Sheikh
ab rashid lone
Rashid Ashraf Wani
MANZOOR AHMED NATNOO
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TermsandConditionsoftheContract.pdf
Tender Documents • 0.21 MB
BOQ_728371.xls
BOQ • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .