| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹12.0 L+₹2,282.29 (0.19%)Rejected-Finance | ₹12.0 L+₹2,282.29 (0.19%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
13 Aug 2026, 10:30 amClosed
EE RED Shamli
EE RED Office Shamli
08- Gram Jasala mai Taraspal ke makan se Praveen ke makan ki aor cc road, deewar niraman avm Ratiram ke makan se Praveen ke makan tak RCC Nali Niraman karya.
2026_REDUP_1174831_8
392/EERED/TENDER/2026-27/ Dt 13-07-2026
Open Tender
Construction Works
Percentage
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹25,000
21 Aug 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upłoalead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material And (mord No. 300) | 46.17 | CUM | 183 | ₹8,449.11 |
| 2 | Providing concrete for plain/reinforced concrete 1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 And (mord No. 800 & 1200) | 14.11 | CUM | 6,245 | ₹88,116.95 |
| 3 | Brick masonry work in cement mortar in 1:4 substructure complete excepting pointing and plastering, as per drawing in foundation up to plinth and technical specification Clauses 602, 603, 604, 1202 & 1204 And (mord No. 600) | 48.97 | CUM | 5,936 | ₹2,90,685.92 |
| 4 | Plastering with cement mortar (1:4), 12 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204 And (mord No. 600) | 112.5 | SQM | 183 | ₹20,587.5 |
| 5 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings in 1:2:4 and technical specifications Clause 802, 803, 1202 & 1203 And (mord No. 800 & 1200) | 3.16 | CUM | 6,584 | ₹20,805.44 |
| 6 | Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 And (mord No. 800) | 8.11 | CUM | 7,560 | ₹61,311.6 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Mild steel and Medium Tensile steel bars. AS PER DSR 2023 S15.22.1 | 7.96 | qtl | 6,817 | ₹54,263.32 |
| 8 | Granular Sub-base with Well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 77.55 | CUM | 2,451 | ₹1,90,075.05 |
| 9 | Cement concrete with 2cm Gauge approved stone gritt, Coarse sand & Cement in proportion of 1:1.5:3 in cc Pavament (thicknes as per design) cement coarse & fine aggregate conforming to IS standard mixed in concrete mixture/plant of not less then 0.20 cum capacity & appropriate weight batcher using approved mix design, laid in approved fixed from work (steel) channel laying and fixing of 125 micron thick polytheen film, wedges, steel plates including leveling the from work spreading the concretewith shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous o[ration including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified)and water finishing to lines & grade including supply of all material, labour, tools &plants etc. required for proper completion of work and also including complete shifting or recorn 38 fibre rainforcement materials etcl & concrete etc. ch.-280 New item No-9 | 70.5 | cum | 7,461 | ₹5,26,000.5 |
| 10 | Supply and fixing of a sign board including necessary supply of all materials, labour, Tools & plants etc. required for proper completion of the work
As Per S.E. (R.E.D.), Saharanpur Sanction | 1 | NOS | 4,128 | ₹4,128 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Tendernotice_2.pdf
PDF • 0.46 MB
BOQ_2207648.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .