| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-AOC BLOCK N 259 GROUND FLOOR BLOCK N MAYFIELD GARDEN SECTOR GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | ₹1.1 Cr Quoted ₹1.3 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.4 Cr+₹8.1 L (6.19%)Rejected-Finance 491 28 4TH FLOOR TOWNE CENTRE MALL BEHIND D PARK MODEL TOWN NEAR POLICE CHOWKI ROHTAK 124001 | ROHTAK | HARYANA | 124001 | ₹1.4 Cr+₹8.1 L (6.19%) | L-2 | Rejected-Finance l-2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical G 84 NEW PALAM VIHAR PHASE 1 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹90.5 L
EMD Value
₹1.8 L
Closing Date
23 May 2022, 12:00 pmClosed
EE-VII
MCG Office Sec-34
RENOVATION/CONSTRUCTION OF SHAMSHAN GHAT(CREMATION SHED , WAITING HALL , STORE ROOM ,GUARD ROOM , TOILET , PAVER BLOCK ETC.) IN VILLAGE ,MULLAHERA, WARD NO. 3, ZONE-IV ,GURUGRAM (HARYANA)
2022_HRY_217647_3
EE-VII/MCG/2022/15786/1
Open Tender
Civil Works
Works
180 days
RENOVATION/CONSTRUCTION OF SHAMSHAN GHAT(CREMATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹1.8 L
Yes
12 May 2023
18 May 2022
23 May 2022
18 May 2022
23 May 2022
18 May 2022
Amount
Forming groove of uniform size in the top layer of washed stone grit plaster as per approvedpattern using wooden battens, nailed to theunder layer, including removal of woodenbattens, repair to the edges of panels andfinishing the groove complete as per specifications and direction of the Engineer-incharge
Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6-45 meters, Discharge 57-13 LPM
Providing and fixing Concertina coil 0.75mm expension of case 7m/coil with high tensile spring steel size 2.50mm dia including M.S angle nut & bolt and carriage, loading and uploading in all respect.(
providing and fixing G.I pipes complete with G.I fitting and clamps including trenching and refilling etc. ( External work) 25mm
Providing and laying Granular Sub Base Grade-III Complete in all respect
providing and fixing G.I pipes complete with G.I fitting and clamps including cutting and jointing good the walls etc. Internal work concealed pipes including painting with anti corrosion bitumastic paint cutting chases and making goot the wall. 20mm
Supply and Planting of Raphis Palm plant including digging of holes,cost of loading,unloading and planting in position including watering and labour cost with three months maintenance period complete in all respect.
Washed stone grit plaster on exterior walls height upto 10 metre above ground level, in two layers, under layer 12 mm cement plaster 1:4 (1 cement : 4 coarse sand ), furrowing the under layer with scratching tool, applying cement slurry on the under layer @ 2 Kg of cement per square metre, top layer 15 mm cement plaster 1:1/ 2:2 (1 cement: 1/2 coarse sand : 2 stone chipping 10 mm nominal size), in panels with groove all around as per approved pattern, including scrubbing and washing the top layer with brushes and water to expose the stone chippings ,complete as per specification and direction of Engineer-incharge (payment for providing grooves shall be made separately).
Providing and Fixing G.I pipes complete with G.I. fitting and clamps including cutting and jointing good the same etc. internal work concealed pipes including painting with anti corrosion bitumastic paint cutting chases and marking good the wall 15mm
Providing of Grey Concrete Grass Paver block. size 300x300x60mm material: Concrete, Shape : UV Thickness of Paver 60mm
Supply and Planting Trees including digging of holes, cost of loading, unloading and planting in position, preliminary watering and loabour cost complete in all respect. Ficus balck
Supply , Erection and testing of 1200mm sweep 240V AC,50Hz, BEE energy 5-star rating ceiling fan with necessary connections with 1.5 sqmm copper wire with adjacent fan point complete in all respects of engineer incharge of the work. (1714.00+0%=1714.00) SDS.
Supply, Erection,testing & commissioning of 1x36/40 watt 1220 mm long fluorescent tube T-5 fittings directly on wall including necessary connections with 0.75 sqmm PVC copper flexible cable for connecting the tube with the adjacent light point complete in all respects of engineer incharge of the work.Make:- Philips,Bajaj,GE,Wipro,Klite,crompton greaves
Bidder Name
Amount
CROSS ROAD BUILDCON PRIVATE LIMITED(GSTN-NA)
M/s Mahashiv Promoters Pvt. Ltd.(GSTN-NA)
M/s Mahashiv Promoters Pvt. Ltd.
M/s Mahashiv Promoters Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .