Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 CrAccepted-Finance 129 5 MALVIYA ROAD GEORGE TOWN PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | ₹7.9 Cr | L1 | Accepted-Finance L1 |
| 2 | L2₹8.8 CrRejected-Finance | ₹8.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹9.1 CrRejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹9.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹9.2 CrRejected-Finance | ₹9.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹9.9 CrRejected-Finance | ₹9.9 Cr | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M/S DHYAN SINGH L4 | M/s A.K. Associates L2 | TIRUPATI BALAJI CONSTRUCTION L6 | M/s S.S. ASSOCIATES L1 | M/S ANMOL TRADERS L5 | M/S PAWAN KUMAR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. As per MoRTH specification 505 Complete in all respects Gr-1 (including labour cess, royalty but Excluding GST) | 50 | Cum | 7,900 ₹4.0 L | 9,000 ₹4.5 L | 8,000 ₹4 L | 8,000 ₹4 L | 3,400 ₹1.7 L | 7,800 ₹3.9 L |
| 2.00 | Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MoRTH specification 503 (including labour cess, royalty but Excluding GST) | 2,81,000 | Sqm | 9 ₹25.3 L | 12 ₹33.7 L | 13 ₹36.5 L | 10 ₹28.1 L | 9 ₹25.3 L | 9 ₹25.3 L |
| 3.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rate including labour cess and royality but excluding GST | 50 | Cum | 2,500 ₹1.3 L | 2,500 ₹1.3 L | 2,000 ₹1 L | 2,600 ₹1.3 L | 2,900 ₹1.4 L | 1,500 ₹75,000 |
| 4.00 | Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed VG-30 with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects complete in all respect (bituminious concrete Gr-2) includng labour cess but excluding GSt | 8,406 | Cum | 10,600 ₹8.9 Cr | 10,000 ₹8.4 Cr | 11,300 ₹9.5 Cr | 9,000 ₹7.6 Cr | 11,400 ₹9.6 Cr | 10,500 ₹8.8 Cr |
| 5.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted earth) includng labour cess but excluding GSt | 500 | Cum | 60 ₹30,000 | 50 ₹25,000 | 40 ₹20,000 | 60 ₹30,000 | 50 ₹25,000 | 20 ₹10,000 |
| 6.00 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.( includng labour cess but excluding GSt ) | 5,000 | Cum | 60 ₹3 L | 50 ₹2.5 L | 40 ₹2 L | 30 ₹1.5 L | 20 ₹1 L | 15 ₹75,000 |
Tender Value
₹12.1 Cr
EMD Value
₹24.1 L
Closing Date
13 Apr 2026, 12:00 pmClosed
Superintending Engineer
Pratapgarh Circle, PWD, Pratapgarh
Renewal of Husenganj Hathgaon Airyan Allipur Jeeta Road (MDR-81C) with BC
2026_CEALD_1133491_1
1209/95C-ETENDERING/PFC/2026 DT. 17.03.2026
Open Tender
Civil Works
240 days
Fatehpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹24.1 L
Pratapgarh Circle, PWD, Pratapgarh
21 May 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Providing and laying dense graded bituminous macadam with higher capacity HMP using crushed aggregates of specified grading, premixed with VG-30 bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. As per MoRTH specification 505 Complete in all respects Gr-1 (including labour cess, royalty but Excluding GST) | - | Cum | - | - | item-1 |
| 2 | Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. As per MoRTH specification 503 (including labour cess, royalty but Excluding GST) | - | Sqm | - | - | item-2 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Rate including labour cess and royality but excluding GST | - | Cum | - | - | item-3 |
| 4 | Providing and laying bituminous concrete with higher capacity hot mix plant using crushed aggregates of specified grading, premixed VG-30 with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects complete in all respect (bituminious concrete Gr-2) includng labour cess but excluding GSt | - | Cum | - | - | item-4 |
| 5 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Carted earth) includng labour cess but excluding GSt | - | Cum | - | - | item-5 |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.( includng labour cess but excluding GSt ) | - | Cum | - | - | item-6 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
Addendum_SBD.pdf
Tender Documents • 1.72 MB
SBD_Part_1.pdf
Tender Documents • 1.12 MB
BOQ_2115768.xls
BOQ • 0.28 MB
SBDPart2.pdf
Tender Documents • 0.78 MB
Download all tender documents and submit your bid