Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 CrAccepted-AOC 104 26 72 D CHANDRALOK COMPLEX BIRHANA ROAD KANPUR KANPUR UTTAR PRADESH 208001 | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹14.5 Cr Quoted ₹10.8 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹12.7 Cr+₹1.9 Cr (18.1%)Rejected-Finance BIRPARA PO BIRPARA DIST JALPAIGURI W B PIN 735204 | ALIPURDUAR | WEST BENGAL | 735204 | ₹12.7 Cr+₹1.9 Cr (18.1%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹12.7 Cr+₹2.0 Cr (18.2%)Rejected-Finance 41 B I BAZAR NEW CANTT ALLAHABAD PRAYAGRAJ 211001 UTTAR MBL 9415216113 | ₹12.7 Cr+₹2.0 Cr (18.2%) | L3 | Rejected-Finance Rejected |
| 4 | L4₹13.3 Cr+₹2.6 Cr (23.7%)Rejected-Finance | ₹13.3 Cr+₹2.6 Cr (23.7%) | L4 | Rejected-Finance Rejected |
| 5 | L5₹13.7 Cr+₹2.9 Cr (27.1%)Rejected-Finance | ₹13.7 Cr+₹2.9 Cr (27.1%) | L5 | Rejected-Finance Rejected |
Tender Value
₹19.0 Cr
EMD Value
₹38.1 L
Closing Date
11 Jun 2024, 12:00 pmClosed
Chief Executive Officer, UPRRDA
4TH and 5TH FLOOR, GANNA KISAN SANSTHAN NEW BERRY ROAD, LUCKNOW.
Construction and 5 year Maintenance Works of District- Prayagraj Under FDR Group UPFDR- 211
2024_UPRRD_133496_21
8903/T-251/ UPRRDA/PMGSY-3/23-24 Dt. 28-2-24
Open Tender
CIVIL
Percentage
365 days
Prayagraj
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹38.1 L
Chief Executive Officer, UPRRDA
9 Dec 2024
2 Apr 2024
12 Jun 2024
2 Apr 2024
11 Jun 2024
15 Apr 2024
10 Apr 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Road:- MRL19- Soraon kalyanpur road km-2 se raiya saraichandbharat balaimau yadavpur jamalpur hote hue baradari choraha (soraon holagarh)road tak, Pkg No UP-03219 | - | - | - | - |
| - | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. Non thorny jungle) ( By Mechanical Means) | - | Sqm | 5 | - |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 100 m as per Technical Specification Clause 301.5 (Local Earth) | - | Cum | 104.1 | - |
| - | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (Carted Earth) | 1 | Cum | 105.3 | ₹105.19 |
| - | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Local Earth) | 1 | Cum | 105.2 | ₹105.09 |
| - | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Carted Earth) | - | Cum | 106.4 | - |
| - | Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. | - | Cum | 333.3 | - |
| - | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202, By Manual Means (Granular Courses) | - | Sqm | 158.1 | - |
| - | Full Depth Reclammation process of existing Flexible Pavement in 5.8 m width and 250mm depth.
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using chemical additives / otherwise: Providing lverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-72-2015 and IRC-37-2012. Cementitious additive @ rate of minimum 4% should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fiited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. | 0.8 | Sqm | 3,760 | ₹3,004.24 |
| - | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavater at OMC, and compacting with smooth wheeled roller to achieve the desired density as per clause 401(GSB Grade I) | - | Cum | 3,230.3 | - |
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_209462.xls
BOQ Document • 0.39 MB
142884542.pdf
Tender Document • 2.93 MB
SBD_FDR_UP_211.pdf
Tender Document • 3.76 MB
142884544.html
Tender Document • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .