Block Development Office VP
Poonamallee Union
Construction of Public Distribution Shop Building at Nochimedu in Nemam Panchayat
2023_RDTN_337740_1
AGAMT II-2023-24-PKG 11
Open Tender
Civil Works
Works
90 days
Poonamallee Union
class III
4 documents required · 4 mandatory
₹0
₹16,000
Yes
Block Development Office VP
22 Jul 2023
7 Jul 2023
22 Jul 2023
7 Jul 2023
21 Jul 2023
8 Jul 2023
8 Jul 2023
Amount
1.CONSTRUCTION OF PUBLIC DISTRIBUTION SHOP BUILDING AT NOCHIMEDU IN NEMAM PANCHAYAT
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water etc., in SDR Soil- 1st depth
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water etc., in SDR Soil- 2nd depth
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water etc., in SDR Soil- 3rd depth
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well rammed, watered and compacted Complete complying with standard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Filling in Basement with conveyed earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Reniforced Cement concrete 1 :1.5:3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Below Basement
Above Basement
Brick work in CM 1:5 mix using country bricks ground moulded of size 23 x 11 x 7 Cm for the following including curing etc., complete complying with standard specifications.
(Basement)
(Super structure)
Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and blinding wire all floors etc., complete complying with standard specification.
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
(Basement)
(Super structure)
ROOF SLAB,LINTEL
SUNSHADE
Finishing the top of the roof with one course of Machine Pressed Tiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement used and the joint pointed neatly to full depth of tiles with the same water proofing compound mixed with cement mortar, red oxide, etc., complete complying with standard specification
Supply and fixing of Cadapah slab including cost and supply of work site etc complete.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshade, facial, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick. including raking the surface. The rate is to include the cost of providing cement mortar beading or nosing for sunshades & staircase steps, landing slabs etc., complete complying with standard specifications.
Plastering with CM 1:5,12mm thick. over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with scratch proof ceramic tiles of any color and any size laid in CM 1:2, 20mm thick. And pointing with white cement 0.4 Kg per sqm mixed with coloring pigment to suit the color of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers.
Dadooing walls with Glazed tiles of any color and any size laid in CM 1:2, 10mm thick. and pointing with white cement 0.4 Kg per sqm mixed with coloring pigment to suit the color of the tiles including finishing the joints neatly complying with the standard specifications and as directed by the departmental officers. The Glazed tiles should be got approved from the Departmental officers before execution.
Distempering two coats with best approved oil bound distemper including cost of painting priming coat over new plastered surface and conveyance of all materials to site and all labor charges
Interior / Exterior Emulsion Two coats over priming coat including cost and conveyance of all materials and labor charges etc complete.
Painting two coats over new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with best approved best quality of synthetic enamel paint of approved color over the existing priming coat etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and fabrication of the following steel doors , and windows including cost and conveyance and all charges etc complete.
Door D1
Window
Window 1
Ventilator
Rolling shutter
Towards Labour Charges for fixing in position of steel Door including cost and conveyance of all materials to work site and labor charges etc complete.
Towards Labour Charges for fixing in position of steel Window,Weldmesh& Glassed Ventilator including cost and conveyance of all materials to work site and labor charges etc complete.
Supply and fixing of Teak Wood Board for providing Watt Hours Meters etc complete.
Supply and fixing of 15 A Aerial Fuse unit (500A) unsuitable 100 x 100 Teak Wood Board Concealed box Using Clamps SD-128
Supply and fixing of 16 Amps DPIC switch of 500V grade with Fuse and Neutral on suitable T.W. board with painting of suitable color with PWD Earthling (SD No.154)
Supply and run of 2 of 6 sq. mm ( 84/0.30) polythene insulated and PVC unsheathed S.C. Alu cable of 1100 V on 7/20 Gi bearer wire for Service Connection Main - SD.64
Supply and run of 2 x1.5sq. Mm(22/.3) PVC insulated SC unsheathed CU. Conductor of 1100Grade in 25mm Dia GI PIPE (Glass"B")suitably Bent at both ends with necessary angle iron upright and end supports for Mains SD 69
Supplying and fixing of CFL including all cost and conveyance to work site etc complete
Supply and fixing of W.T. Bulk head fitting complete with guard suitable for lamp with 40 W bulb with PVC unsheathed leads from terminal to the fitting - SD. 83
Wiring with 2 x 2.5 Sq.mm PVC unheated SC allocable of 650V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with T.W. Switch box in flush with wall, covered with nylon sheet of 3mm thick with painting of suitable color for open PVC light point / Fan Point SD 20
Wiring with 2 x 2.5 Sq.mm PVC unheated SC allocable of 650V grade in suitable PVC rigid pipe on wall and ceiling with PVC accessories with 150 x 100 x 113mm T.W. switch box in flush with wall, covered with nylon sheet of 3mm thick 5 Amps 3 pin non - interlocking C.S. Plug top with painting of suitable color for open PVC plug point.- SD -36.
Supply and Fixing of Ceiling fan including cost and conveyance of all materials and labor charges etc complete.
Towards cost and fixing of 240 w CFL bulb fittings with pipe and bilkers etc
Supply and fixing of Zinc sheet Box for Watt Hours Meters Etc Complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
C.munuswamy
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .