EE (SDW) VII
NSTP Coronation Pillar Delhi 110009
Renovation of Standard make APFC Panel installed at RU Nagar SPS
2024_DJB_255756_2
NIT No 23 (2023-24)
Open Tender
Miscellaneous Works
Works
30 days
NSTP Coronation Pillar
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Online
₹7,000
16 Mar 2024
8 Mar 2024
15 Mar 2024
8 Mar 2024
15 Mar 2024
8 Mar 2024
Dismantling of capacitors and other components of capacitors panel and dismantling of old damaged components of APFC panels i.e. capacitors, MCB, contactors, APFC relay, indicating lights and their power & control wiring connections with main bus bar and incoming & outgoing circuits etc. as required.
Supply of Super heavy duty capacitors of various capacities rated at 440V , 3 phase, 50 Hz Ac complete with terminal cover and discharge device- make STANDARD
Banking of capacitors of various capacities with multistrand copper wires & lugs /aluminum bus bars and mounting arrangement for parallel connection to form suitable rating capacitor bank
Supply of 12 Stage microprocessor based APFC relay with digital display of power factor and other parameters. Make :- Standard
Control wiring of APFC relay with multistrand copper wires, lugs, tapes etc. As required at site
Supply of capacitor duty contactors for capacitors rating 25 KVAr. Make: Standard
Supply of Triple Pole MCB 63 A rating. Make:- L&T/ Standard
Power wiring of contactors and MCBs for incoming and outgoing circuits with multistrand copper wires, lugs, tapes etc. As required at site
Supply &fixing of LED type indication lights of various colors as required at site-make FTC/Technik/Standard
Installation of capacitor banks including termination with existing cables, gland and lugs earthling of capacitor banks as required at site.
Servicing of panels including complete dusting of all components, cleaning of contact point with CTC solution, decarbonizing of various joints, tightening of all nut bolts, sleeving of live parts alignment of doors to prevent ingress of moisture and vermin and touching of rusted parts of the panels etc. as required at site.
Fixing of all above components in the APFC panel with suitable fabrication work to accommodate new items in the existing feeders for alignment of components and ease of termination complete with hardware etc. as required at site.
Testing & commissioning of complete capacitor installation including following: 1. Dusting of complete panel. 2. Meggering of complete capacitor installation using 500V megger. 3. Continuity test for checking continuity of all circuits. 4. Alignment of doors 5. Tightening of all nuts and bolts. 6. Cleaning of all contac points and joints. 7. Setting of APFC relay for target power factor
bhawani electrical system
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .