Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-Finance | ₹12.0 L | L1 | Accepted-Finance L1 |
| 2 | L2₹12.0 L+₹360.02 (0.03%)Rejected-Finance | ₹12.0 L+₹360.02 (0.03%) | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
21 Apr 2026, 12:00 pmClosed
EEREDAGRA
EEREDAGRA
Vikas khand Fatehabad ke gram bhojpura prathmik Vidyalay mein ek kaksh ka Nirman karya.
2026_REDUP_1135600_32
1628/NIVIDA AGRA/2025-26 dt 28.3.2026
Open Tender
Civil Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹24,000
Yes
17 Jul 2026
15 Apr 2026
21 Apr 2026
15 Apr 2026
21 Apr 2026
15 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation inord.soilincluding all charges (S.I.No251) | - | Cum | - | - |
| 2 | Concrete with 4 cm gauge brick ballast, fine sand and cement in proportion of 1:4:8 in foundation including supply of all materials labour and T& P etc required for proper completion of the work.(S.I.No275) | - | Cum | - | - |
| 3 | M-150 class brick work in 1:4 cement and coarse sand of 1.25 FM mortar in foundation and plinth including supply of all material labour aand T&P etc required for proper completion of the work(S.I.No 303) | - | Cum | - | - |
| 4 | R.C.C. work with cement , coarse sand and 2 cm gauge stonr ballast in the proportion of 1:1.5:3 in Beams execulding supply of reinforcementbut i/c all.( S.I.No 289) | - | Cum | - | - |
| 5 | R.C.C. work with cement , coarse sand and 2 cm gauge stonr ballast in the proportion of 1:1.5:3 in Column execulding supply of reinforcementbut i/c all.( S.I.No 287[A]) | - | Cum | - | - |
| 6 | M150 class brick work in 1:6 cement & c/sand mortar in super structure for wall of one brick thick i/c all material , labour T & P etc all complete.(303+309+310) | - | Cum | - | - |
| 7 | R.C.C. work with cement coarse sand and 20 mm gauge stone gritt in the proportion of 1:1.5:3 i/c of all materials, labour T&P etc. for slab.(S I No 284[A]) | - | Cum | - | - |
| 8 | M.S. or iron work in plain R.C.C. work i/c cutting , bending & binding all completed work . DSR 5.22.1 | - | Qtl | - | - |
| 9 | Earth filling in ordinary soil in plinth i/c ramming and dressing in the surface to required levels & slopes and also i/c 1.5 mtr lift and 30 mtr lead with cartage distance of cartage 2.00 km without royality (S I No 253) | - | Cum | - | - |
| 10 | Sand filling in plinth including supply of all material, labour and T&P etc.(SI No 255) | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_2122750.xls
BOQ • 0.31 MB
SBD228.pdf
Tender Documents • 1.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .