Loading…
Loading…
Tender Value
₹7.0 Cr
EMD Value
₹3.5 L
Closing Date
4 May 2026, 3:00 pmClosed
Yes (up to 2 members)
Yes (up to 2 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
TRD
14 conditions · 2 needing a document upload
Financial Capacity: The Bidder shall have a minimum Net Worth (the "Financial Capacity") of [5% of Project cost] at the close of the preceding Financial Year. Net worth has been adopted as the criterion for assessing financial capacity since it is a comprehensive indication of the financial strength of the Applicant. This amount should be 5% (Five percent) of the Estimated Project Cost of the Project for which Bids are being invited. (Note: Please refer RFP Documents for details)
"Composite works of New lines, Gauge Conversion, Doubling, 3rd line, 4th line etc. with 25 KV Railway electrification works with substation work in Indian Railway system / Metro system / suburban transit system / high speed Railways / DFCCIL" OR "Substation & transmission lines Execution work of 25 Kv AC traction substations and switching posts with or without OHE work for Indian Railway system / Metro system / suburban transit system / high speed Railways / DFCCIL Railways" OR "Execution of any HT substation / switch yard of voltage equal to 25 KV and above".
RFP, Para 2.2.2.1 Technical Capacity- For demonstrating Technical Capacity and experience (the "Technical Capacity"), the Bidder shall, during the last 5 (five) previous financial years and the current financial year upto the Base month (not to be read with para - 2.1.13), (i) have received payments for construction of Eligible Project(s), or has undertaken construction works by itself in a PPP project, such that the sum total thereof, as further adjusted in accordance with clause 2.2.2.4 (i) & (ii), is more than 2.5 (two and half) times the Estimated Project Cost (the "Threshold Technical Capacity"). Provided that at least one fourth of the Threshold Technical Capacity shall be from the Eligible Projects in Category 1 and/ or Category 3 specified in Clause 2.2.2.4 (i) & (ii) (ii) Completed (executed) or Substantially completed (executed) at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [35% (thirty-five) per cent] of the Estimated Project Cost However, in case of Consortium/Joint Venture, the other members of Consortium/Joint Venture (who are not considered for satisfying this technical Capacity under this clause) also must have Completed (Executed) or Substantially completed$ at least one Eligible Project of Railway Sector as mentioned in clause 2.2.2.4/iii of value of not less than [10% (ten) per cent] of the Estimated Project Cost. Illustration for 'received payments for not less than 75 (seventy-five) percent': For contract wherein there is provision for part payment on 'procurement of goods and equipment' on basis of indemnity bond/Bank Guarantee. In all such contract, 'received payments for not less than 75 (seventy-five) per cent value of present Contract Value payment' means not less than 75% payment received under 'procurement of goods and equipment' as well as not less than 75% payment received under 'execution/installation/ commissioning'. (Note: Please refer RFP Documents for details)
14 conditions · 12 needing a document upload
Please refer RFP documents and EPC documents for details.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please refer RFP documents and EPC documents for details.
Design, Supply, Erection, Testing & Commissioning of 01 Nos. 2X25 KV Sub- Sectioning and Paralleling Post at Berawanya for Quadrupling lines and dismantling of existing 2x25KV Sub Sectioning and Paralleling Post, in connection with the 3rd and 4th line work between Ratlam-Nagda section of Ratlam Division of Western Railway.
EL-C-RTM-EPC-2025-01-RT
EL-C-RTM-EPC-2025-01-RT
Open
Works - General
12 Months
Ratlam, Madhya Pradesh
₹0
₹3.5 L
4 May 2026
23 Mar 2026
20 Apr 2026
4 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 6,99,26,193 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
APPROVEDLOCATIONPLANBRNASSP.pdf
ATTACHMENT
EPC ACS1
ATTACHMENT
Specification of Transformer
ATTACHMENT
PSIGuidelineTIIN0043Rev01.pdf
ATTACHMENT
Autotransformer Specification
ATTACHMENT
RFPBRNASSP_1.pdf
ATTACHMENT
TenderAgreement.pdf
ATTACHMENT
PreBidConferenceMeeting.pdf
ATTACHMENT
Powermakelistlatest.pdf
ATTACHMENT
R_22922_1751869848682.pdf
ATTACHMENT
ACS-1ofEPCContractPolicyDated17.11.2025.pdf
ATTACHMENT
TI_SPC_PSI-TRNPWR_5200_with_A_and_C_Slip_No_02.pdf
ATTACHMENT
AutotransformerSpecificationTI-SPC-PSI-AUTOTR-1200.pdf
ATTACHMENT
StandardEPCTenderDocumentforsinglestagetwopacketsystemAmendmentNo2_compressed.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .