| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.9 LAccepted-AOC | ₹5.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹5.9 LRejected-Finance | ₹5.9 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | MASS INFRASTRUCTURE L2 | ANBU INFRA L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Slab Culvert to Vedambarai Adi Dravidar BG Road at Adhichamangalam Habitation in Adhichamangalam Panchayat. in Valangaiman Block ,Tiruvaur District. | |||||
| 2.00 | Earthwork Excavation and depositing on banks with all leads etc | 34.97 | cum | 263.78 ₹9,224.39 | 263.78 ₹9,224.39 |
| 3.00 | Sand filling with good filling sand in layers not more than 15cm thick including cost and conveyance of all materials and all labour chages etc., complete | 4.56 | cum | 2,554.59 ₹11,648.93 | 2,554.59 ₹11,648.93 |
| 4.00 | Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 3.04 | cum | 6,401.91 ₹19,461.81 | 6,401.91 ₹19,461.81 |
| 5.00 | Cement concrete 1:3:6 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete | 19.86 | cum | 6,672.71 ₹1.3 L | 6,672.71 ₹1.3 L |
| 6.00 | Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete.SUPERSTRUCTURE | 17.29 | cum | 7,695.35 ₹1.3 L | 7,695.35 ₹1.3 L |
| 7.00 | Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete.BED BLOCK | 2.12 | cum | 7,695.35 ₹16,314.14 | 7,695.35 ₹16,314.14 |
| 8.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. UPTO SILL | 33 | sqm | 549.5 ₹18,133.50 | 547.5 ₹18,067.50 |
| 9.00 | Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. ABOVE SILL | 76.89 | sqm | 1,105 ₹84,963.45 | 1,088 ₹83,656.32 |
| 10.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken granite stones for all RCC items of works excluding centering shuttering and cost of reinforcement including curing etc.,complete | 2.81 | cum | 10,022.71 ₹28,163.82 | 10,022.71 ₹28,163.82 |
Tender Value
₹5.9 L
EMD Value
₹5,920
Closing Date
20 Jan 2026, 3:00 pmClosed
Block Development Officer(V.Pt), Valangaiman
Block Development Officer(V.Pt), Valangaiman
Providing Slab Culvert at Vedambarai AD Mayana Street at Adichamangalam Habitation in Adichamangalam Panchayat
2026_RDTN_640081_1
4417/2025/B1
Open Tender
Civil Works
Adichamangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,920
Yes
3 Feb 2026
8 Jan 2026
20 Jan 2026
8 Jan 2026
20 Jan 2026
8 Jan 2026
1.Construction of Slab Culvert to Vedambarai Adi Dravidar BG Road at Adhichamangalam Habitation in Adhichamangalam Panchayat. in Valangaiman Block ,Tiruvaur District.
Earthwork Excavation and depositing on banks with all leads etc
Sand filling with good filling sand in layers not more than 15cm thick including cost and conveyance of all materials and all labour chages etc., complete
Cement concrete 1:4:8 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Cement concrete 1:3:6 mix using 40mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete
Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete.SUPERSTRUCTURE
Cement concrete 1:2:4 mix using 20mm HBG Metal including cost and conveyance of all materials and all labour chages etc., complete.BED BLOCK
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. UPTO SILL
Supply and erection of steel centering, shuttering for soffits and sides including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG10 stiffened with MS angle of size 25 X 25 X 3 mm for boarding laid over I type MS Truss of size 25 X 25 X 3mm about 90cm c/c and supported by 40mm GI pipes (Medium) spaced at 75cm c/c etc complete and as directed by the TWAD Board Officers. ABOVE SILL
Reinforced Cement concrete 1:1.5:3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken granite stones for all RCC items of works excluding centering shuttering and cost of reinforcement including curing etc.,complete
Supplying, cutting, bending, tying, fabricating and placing in position of steel rods for all RCC works including cost of steel and binding wire etc.( The steel should conform to the relevant ISspecification and supplied with test certificate Fe. 415 grade as per IS specification No.1786/1985 and as amended from time to time) delivery at site of work including loading, freight, unloading, stacking, transit insurance charges, taxes etc. complete.and as directed by the TWAD Board officers.
Providing and Fixing 20mm Bitumen felt for expansion joint between Dirt wall &Deck slab etc
Providing and fixing Tar paper including all charges etc
Providing and fixing Weepholes of 100mm dia incuding cost and conveyance etc
Collection and supply of Gravel from approved quarry incuding cost and conveyance etc
Provision for Name board charges
Provision for Photographic Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
p2.pdf
Tender Documents • 0.83 MB
t2.pdf
Additional Documents • 0.93 MB
BOQ_766383.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid