Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹73.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹75.1 L+₹1.5 L (2.01%)Admitted-Finance 09 PANZGAM TANGDAR ROAD CHOWKIBAL KUPWARA JAMMU KASHMIR 193224 | KUPWARA | JAMMU AND KASHMIR | 193224 | L2 | Admitted-Finance | ||
| 3 | L3₹75.9 L+₹2.3 L (3.06%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Mismatch in the signature of the bidder on the uploaded tender documents with the signature appearing on the PAN Card. | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-SRO-277 affidavit not uploaded |
Tender Value
₹73.6 L
EMD Value
₹1.5 L
Closing Date
29 Oct 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er Ranjit singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
BOQ
2026_PWDJK_329201_1
E-NIT NO. 70 Of 2026-27 Dated 23-10-2026
Open Tender
Civil Works
Percentage
90 days
Boombari
NIT
2 documents required · 2 mandatory
₹1,000
Yes
XEN PWD RNB DIVISION RAMBAN
₹1.5 L
Yes
31 Oct 2026
24 Oct 2026
30 Oct 2026
24 Oct 2026
29 Oct 2026
24 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 128 | Cum | 592.9 | ₹75,891.2 |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge All kinds of Soil | 60.48 | Cum | 576.45 | ₹34,863.7 |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 meters lead | 450 | Kg | 4.3 | ₹1,935 |
| 4 | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. (using avaialble steel) | 450 | Kg | 70 | ₹31,500 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 42 | Cum | 218.4 | ₹9,172.8 |
| 6 | Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts | 100 | 100 Sqm | 61.82 | ₹6,182 |
| 7 | Dry stone pitching 22.5 cm thick including supply of stones and preparing surface complete. | 421.6 | Sqm | 713.7 | ₹3,00,895.92 |
| 8 | Providing and laying 10mm thick, l cement: 3 fine sand mortar slurry' on beds and side slopes (prior to laying In-situ concrete lining) | 123.6 | Sqm | 77.75 | ₹9,609.9 |
| 9 | Providing and fixing bolts including nuts and washers complete. | 138.32 | Kg | 131.2 | ₹18,147.58 |
| 10 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 2,286.14 | Kg | 120.8 | ₹2,76,165.71 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
BOQ_1115404.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .