Tender Value
₹16.3 L
EMD Value
₹16,300
Closing Date
16 Aug 2023, 3:00 pmClosed
Block Development Officer
Block Development Officer Thiruvidaimarudur Block
Part.01. Desilting of Alakkarai Street Kulam and Construction of Retaining wall, Bhathing Ghat at Perappadi Panchayat, Thiruvidaimarudur Block Part.02. Desilting of Udaiyar Street Kulam and Construction of Retaining wall, Bhathing Ghat at Perappadi P
2023_RDTN_356932_1
Rc.No.2083/2023/A6/07.08.23
Open Tender
Civil Works - Others
Item Rate
180 days
Block Development Officer
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹16,300
Yes
29 Aug 2023
9 Aug 2023
16 Aug 2023
9 Aug 2023
16 Aug 2023
9 Aug 2023
Amount
Part.01. Desilting of Alakkarai Street Kulam and Construction of Retaining wall, Bhathing Ghat at Perappadi Panchayat, Thiruvidaimarudur Block
Desilting
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Retaining Wall
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete.
Bathing ghat
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc.,
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete.
Inlet
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete. (Below GL)
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete. Above GL)
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Part.02. Desilting of Udaiyar Street Kulam and Construction of Retaining wall, Bhathing Ghat at Perappadi Panchayat, Thiruvidaimarudur Block
Desilting
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Retaining Wall
Earthwork excavation for foundation (for narrow excavation) to full depth as per designed in all soils and sub soils except soft disintegrated rock not requiring blasting and hard rock requiring blasting and bailing water wherever necessary. Refilling the sides of foundation with excavated earth other than sand in layers of well rammed and compacted and depositing the surplus earth in places shown by the departmental officers with an initial lead of 10m and initial lift of 2m and clearing and leveling the site etc. complete complying with standard specification.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete.
Bathing ghat
Earthwork excavation in all classes of soils and depositing on bank with an initial lead and lift such as sand or other loose soil, wet sand not under water silt and ordinary soil, sandy loom, and hard stiff, black cotton soil, red earth, earth mixed with 50% fair sized boulders including all labour charges etc., complete for foundation.
Supplying and filling in foundations and basement with filling M sand in layers not exceeding 15 cm. thick, well watered ,rammed and consolidated etc. complete complying with standard specifications.
Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement.
CC 1:3:6 mix using 40mm ISSHBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying, Compacting and watering etc., complete.
Brickwork in CM 1:5 mix using Country Bricks of standard size including cost and conveyance of all materials to worksite, including labour for watering with good water within 200m lead for good water, including all labour and all other incidental charges etc.,
Plastering in CM 1:5 to 12mm thick including cost and conveyance of all materials to work site and all labour charges and other incidental charges etc., complete.
Supplying and errecting centring including all cost of labour and all other incidental charges etc.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIJAYALAKSHMI RADHAKRISHNAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .