Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC | ₹5.1 Cr Quoted ₹10.8 L | L1 | Accepted-AOC Accepted being lowest rate. |
| 2 | L2₹10.8 LSame as L1Rejected-Finance | ₹10.8 LSame as L1 | L2 | Rejected-Finance Rejected for higher rate. |
Tender Value
Refer Docs
EMD Value
₹10.8 L
Closing Date
20 Mar 2021, 12:00 pmClosed
se.ayo.ambe.circle.pwd.ayodhya
office of the se.ayo.ambe.circle.pwd.ayodhya
Widening and strengthning of goshaiganj sherwaghat road km-11, 12, 13 (640).
2021_CEUFZ_568218_2
1430/2Com-Ayo/Ambd Circle/21, Date. 06.03.2021
Open Tender
Civil Works
Item Rate
270 days
office of the se.ayo.ambe.circle.pwd.ayodhya
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,354
₹10.8 L
Yes
office of the se.ayo.ambe.circle.pwd.ayodhya
28 Jun 2021
12 Mar 2021
20 Mar 2021
12 Mar 2021
20 Mar 2021
12 Mar 2021
13 Mar 2021
Amount
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, within all lifts and lead upto 30m.
Earthwork in cutting or in embankment in ordinary / moorum soil, excavation to be in the from of regular pits not exceeding 1/2 metre C 20") in depth and earthwork in embankment to be in 20cm(8) Layers including ramming and dressing the surface to required levels and slopes and also including 1.5metre (5ft) lift and 30m.(100ft) lead. The earth from cutting to be used in making embankment or to be desposited as soil banks within 30m.(100ft) distance as directed by the Engineer-in-Charge.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, within all lifts and lead upto 30m. In Patri
Construction of Granular Sub-Base by providing Close graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory roller to achieve the desired density, complete as per technical clause 401
Providing, laying, spreading and compacting graded stone aggregate in layers Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate in layers Stablized Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying tack coat with bitumen (VG-10) using Bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.
Providing and laying bituminous concrete with hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
M/s PSP Construction
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .