Loading…
Loading…
Tender Value
₹77.5 Cr
EMD Value
₹1.6 Cr
Closing Date
13 Oct 2026, 1:00 pm
Executive Engineer
Provincial Division PWD B and R Industrial Area Phase 1 Sector 57 SAS Nagar
Construction of Proposed Dr B R Ambedkar State Institute of Medical Sciences at Sector 81 Mohali Punjab (Girls and Boys Hostel)
2026_CEPW_175782_1
35 dated 15.09.2026
Open Tender
Civil Works - Buildings
Percentage
720 days
Mohali
Please refer Tender documents.
6 documents required · 6 mandatory
₹1 L
₹1.6 Cr
Yes
SE Construction Circle PWD B and R Chandigarh
21 Sept 2026
21 Sept 2026
13 Oct 2026
21 Sept 2026
13 Oct 2026
21 Sept 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORK
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. Mechanical Means | 1,437.21 | Cum | 35.82 | ₹51,480.86 |
| 2 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 1,038 | Cum | 66.37 | ₹68,892.06 |
| 3 | Earth filling under floors with surplus ordinary soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15 cm layers including ramming, watering and consolidating lead upto 30 metres | 5,864 | Cum | 411.8 | ₹24,14,795.2 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 779 | Sqm | 221.25 | ₹1,72,353.75 |
| 5 | Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc. | 7,551 | Sqm | 426.67 | ₹32,21,785.17 |
| 6 | Centering and shuttering for flat surfaces such as suspended floors, roofs, landings, chajjas, shelves etc. | 9,620 | Sqm | 560.46 | ₹53,91,625.2 |
| 7 | Centering and shuttering for sides and soffits of beam, beams, launching girders, bressumers, lintels. | 9,855 | Sqm | 400.33 | ₹39,45,252.15 |
| 8 | Centering and shuttering for columns (Square or rectangular or poly gonal in plain) | 323 | Sqm | 502.52 | ₹1,62,313.96 |
| 9 | Centring and shuttering for stair cases with sloping with soffits including risers and stringers. | 574 | Sqm | 469.86 | ₹2,69,699.64 |
| 10 | Extra rate for shuttering in each subsequent storey above the first. Storey work done in subsequent storey above the first storey up to height of 4 metres or part thereof up to the roof top level of that storey. 1st Floor | 3,390 | Sqm | 10.54 | ₹35,730.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
BOQ_357835.xls
BOQ • 7.26 MB
SBD.pdf
Tender Documents • 20.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .