Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.6 L+₹1,509.10 (0.59%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹2.6 L+₹5,900.98 (2.30%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹2.9 L+₹31,600.95 (12.3%)Accepted-Finance RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L4 | Accepted-Finance L4 |
| Sl No | Description | Qty | Unit | MOHD YAIN L1 | RUPESH ENTERPRISES AND CONSTRUCTION L2 | M/S SHRSDDHA CONSTRUCTION L3 | CHHATAR PAL SINGH CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing thick bushes & thorny jungle clearance without uprooting with disposal i/c all cost of labour, material and t&p complete | 31,440.5 | Sqm | 3.07 ₹96,522.34 | 3.2 ₹1,00,609.6 | 3.15 ₹99,037.58 | 3.04 ₹95,579.12 Lowest |
| 2.00 | Earth work in cutting in ordinay soil with line-dori, levelling, dressing and manual compaction i/c 1.5m lift and disposed excavated soil within 30m lead with proper dressing also i/c all cost of material, labour and t&p required for proper completion of work | 2,087 | Cum | 34.5 ₹72,001.5 Lowest | 38 ₹79,306 | 35.25 ₹73,566.75 | 40 ₹83,480 |
| 3.00 | Scraping internal section with ordinary soil with line-dori, levelling, dressing and manual compaction i/c 1.5m lift and disposed excavated soil within 30m lead with proper dressing also i/c all cost of material, labour and t&p required for proper completion of work | 26,007 | Sqm | 3.38 ₹87,903.66 | 3 ₹78,021 Lowest | 3.45 ₹89,724.15 | 4.19 ₹1,08,969.33 |
Tender Value
₹3.7 L
EMD Value
₹8,000
Closing Date
6 Oct 2026, 3:00 pmClosed
Ex En
EE ID BIJNOR
Silt Clearance scraping of jhal mr.from km 0.00 to 7.660 km.
2026_UPIDC_1190259_22
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Wise
15 days
BIJNOR
Please refer Tender documents.
2 documents required · 2 mandatory
₹677
₹8,000
13 Oct 2026
29 Sept 2026
7 Oct 2026
29 Sept 2026
6 Oct 2026
29 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing thick bushes & thorny jungle clearance without uprooting with disposal i/c all cost of labour, material and t&p complete | 31,440.5 | Sqm | - | - |
| 2 | Earth work in cutting in ordinay soil with line-dori, levelling, dressing and manual compaction i/c 1.5m lift and disposed excavated soil within 30m lead with proper dressing also i/c all cost of material, labour and t&p required for proper completion of work | 2,087 | Cum | - | - |
| 3 | Scraping internal section with ordinary soil with line-dori, levelling, dressing and manual compaction i/c 1.5m lift and disposed excavated soil within 30m lead with proper dressing also i/c all cost of material, labour and t&p required for proper completion of work | 26,007 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
Tendernotice_2.pdf
PDF • 0.63 MB
BOQ_2243696.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .