| 1 | L1₹3.2 LAccepted-AOC | ₹3.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.2 LRejected-Finance NO 46 B CHURCH STREET VELLAGOUNDANPATTI VILLAGE AYYAPURAM POST KADAYANALLUR TALUK TENKASI DISTRICT | TENKASI | TAMIL NADU | 626140 | ₹3.2 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | V.Chidambaram L1 | ANTONY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Providing BT Patches of Keelamathapuram - Pulavanoor link road 0/0 to 0/800 in Kadayam Panchayat in Kadayam Panchayat Union, Tenkasi District.(R-116) Under Rural Road Maintenance Scheme - 2025-26 | |||||
| 2.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2). | 216 | sqm | 6 ₹1,296 | 7 ₹1,512 |
| 3.00 | Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete. | 36 | cum | 140 ₹5,040 | 141 ₹5,076 |
| 4.00Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete. | |||||
| 5.00 | Km 0/0 - 1/0 | 36 | cum | 487 ₹17,532 | 488 ₹17,568 |
| 6.00Advance Bituminous patch work (Average thickness of of 25mm) with 13.2mm IRC HBG metal premixed with 44kg of Bitumen including cost and conveyance of metal from approved quarry, cost of bitumen, labour charges for leveling, tamping etc., complete complying with standard specification. | |||||
| 7.00 | Km 0/0 - 1/0 | 3.47 | cum | 4,667 ₹16,194.49 | 4,668 ₹16,197.96 |
| 8.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 693.54 | sqm | 33 ₹22,886.82 | 34 ₹23,580.36 |
| 9.00Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | |||||
| 10.00 | Km 0/0 - 1/0 | 683.64 | sqm | 296 ₹2.0 L | 297 ₹2.0 L |
Tender Value
₹3.2 L
EMD Value
₹3,210
Closing Date
28 Oct 2025, 4:00 pmClosed
Block Development Officer (B.Pt), Kadayam.
Block Development Office, Kadayam
Providing BT Patches for Keelamathapuram - Pulavanoor road km 0/0 - 0/800 in kadayam panchayat union
2025_RDTN_616454_5
BDKDM/563/2025-A2 - 16-10-2025
Open Tender
Civil Works
KADAYAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,210
20 Feb 2026
23 Oct 2025
28 Oct 2025
23 Oct 2025
28 Oct 2025
23 Oct 2025
Amount
Providing BT Patches of Keelamathapuram - Pulavanoor link road 0/0 to 0/800 in Kadayam Panchayat in Kadayam Panchayat Union, Tenkasi District.(R-116) Under Rural Road Maintenance Scheme - 2025-26
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows whether original, existing (or) produced by digging of roots shall than be carefully filled up the earth well rammed and leveled of and the entire work completed in all respect as per SI 17 (2).
Earth work excavation and depositing on bank with an intial of 10m and lift 2m in hard stiff clay, stiff black cotton, hard red earth and earth mixed with small size boulders, hard gravelly soil etc., as per SS 20A including laying and spreading in layer etc.complete.
Providing laying and compacting red gravel in accordance with requirements of the specification materials shall be in one or more layers as necessary including watering, consolidating by the power roller rolling and all labour charges for soiling including hire charges for consolidation etc. complete.
Advance Bituminous patch work (Average thickness of of 25mm) with 13.2mm IRC HBG metal premixed with 44kg of Bitumen including cost and conveyance of metal from approved quarry, cost of bitumen, labour charges for leveling, tamping etc., complete complying with standard specification.
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in Central Hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for Hectametre stone of size 0.75mx0.23mx0.10m
GST Amount for providing Service to Government Contract Works for the above RENEWAL Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
ANTONY CONSTRUCTION (BID ID -1497922)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_736627.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_736627.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid