Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹4.5 CrAWARDED | ₹4.5 Cr | AWARDED |
Tender Value
₹4.0 Cr
EMD Value
₹6.0 L
Closing Date
27 May 2025, 10:30 pmClosed
Public Works Department
WIDENING AND IMPROVEMENTS TO TIGADI-SUNDHOLI-BAIRANATTI-HUNASHYAL PY -MANNAPUR MDR ROAD KM 14.20 TO 16.00 AND UPTO DHAVALESHWARA BASAVESHWAR CIRCLE ARLIMATTI IN MUDALAGI TALUKA OF BELAGAVI DISTRICT UNDER 5054-04-337-0-01-154 MDR ROAD IMPROVEMENTS (APPENDIX-E) FOR 2024-25
PWD/2025-26/RD/WORK_INDENT21629
PWD/2025-26/RD/WORK_INDENT21629
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Chikkodi
₹5,000
₹6.0 L
12 May 2025
12 May 2025
29 May 2025
23 May 2025
22 May 2025
Compacting Original Ground - Compacting original ground supporting embankment - Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of emba...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Mechanical Means -
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm a...
Construction of Subgrade and Earthen Shoulders - Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting...
Granular Sub-Base - By Mix in Place Method - Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared sur...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC ...
Prime Coat over WMM/WBM - Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying ...
Tack coat on Granular surface treated with primer - Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. R...
Surface Drains in Soil - Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated mate...
Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface - Providing and laying of hot applied thermoplastic compound 2.5 mm thick including ref...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total int...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Retro-Reflectorised Traffic Signs - Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class B Type IV ret...
Direction and Place Identification Signs with size more than 0.9 m2 size Board. - Providing and erecting direction and place identification retro- reflectorised sign as per IRC:67:2022 mad...
Kilometre Stone - Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc - Ordinary kilometer ston...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Bituminous Macadam Grading - II for traffic <20 MSA - Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading prem...
Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading pre...
Construction of 2 CDs of 1 row 1000 dia NP 3 Pipes at Chainage at selected Chainages
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
Construction of 3 CDs of 3 row 1000 dia NP 3 Pipes at selected Chainages
Mechanical Means -
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, stru...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates ...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works fro...
Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting,...
PIPE CULVERTS - Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row - Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding...
Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transporta...
3rd, 4th and 5th year Maintenance
Road Maintenance for 3rd year for road with BM+SDBC as wearing coat
Maintenance of Road for 3rd year by Cleaning and Uprooting Vegetation on either sides of the road Maintenance of surface drains by c...
Road Maintenance for 4th year for road with BM-SDBC as wearing coat
Maintenance of Road for 4th year by Clearing and Uprooting Vegetation on either sides of the road. Maintenance of surface drains by ...
Road Maintenance for 5th year with BM+SDBC coat as wearing coat
Maintenance of Road for 5th year by Clearing and Uprooting Vegetation on either sides of the road.Maintenance of surface drains by clear...
11KV Electrical pole shifting Estimates
HT linePSC Pole - 9 Mtrs Long, 200 kg WL (As per HESCOM SR 2023-24. Page No 347 Sl No. 6 I No 1.06, Rs 4199.00, Labour Charges Rs 1113+629=1472 As per HESCOM SR 2023-24. Page No 388 Sl No 30, I No 2.0...
HT linePSC Pole - 9 Mtrs Long, 200 kg WL (As per HESCOM SR 2023-24. Page No 347 Sl No. 6 I No 1.06, Rs 4199.00, Labour Charges Rs 1113+629=1472 As per HESCOM SR 2023-24. Page No 388 Sl No 30, I No 2.0...
HT lineRelising & Re-fixing PSC Pole - 9 Mtrs Long, 200 kg WL (As per HESCOM SR 2023-24. Labour Charges Rs 1113+629=1472*1.9 As per HESCOM SR 2023-24. Page No 388 Sl No.30,I No2.02 &Page No 387 Sl No1...
HT line11 kV Pin Insulators (Polymeric type),As per HESCOM SR 2023-24. Page No 349 Sl No 52 I No 6.06, RS 205.00)
---- including cost of all materials, labor ,HOM,l
HT lineReleasing & Restringing of Rabbit ACSR Conductor, (Labour Charges RS 4361*1.90=8285.90.00 As per HESCOM SR 2023-24 Page No 390 Dl No.65, I No 6.02))
---- including cost of all ma...
Distribution Transformer Center (DTC)-9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) As Per HESCOM Sr 2023-24 Page No 340 Sl No C Rs 31554 - Labour Charges Rs 6983 As per HESCOM SR 2023-24...
Distribution Transformer Center (DTC)-9 Mtr RCC DP Transformer Structure (Using 9 Mtr RCC Poles) As Per HESCOM Sr 2023-24 Page No 340 Sl No C Rs 31554 - Labour Charges Rs 6983 As per HESCOM SR 2023-24...
Distribution Transformer Center (DTC)-Releasing & Refixing of Single pole TC set suitable for 25 kVA Transformer Labour Charges 1709*1.9=3247 Rs Page No 340 Sl No 7(a)
---- including co...
Distribution Transformer Center (DTC)-Releasing and re-erection of 100KVA Distribution Transformer Laboue Chares Rs 1590*1.3021.00 As per Hescom Sr 2023-24 Page No 390 Sl No 73 I No 8.02
-Labour Cost ...
Distribution Transformer Center (DTC)-Earthing materials pipe type for grounding as per HESCOM SR 2023-24 Page NO 344 Sl NO 25(a) Rs 1729.00 Labour Charges Rs 949.00 As per HESCOM SR 2023-24 Page NO 3...
Distribution Transformer Center (DTC)-Earthing materials pipe type for grounding as per HESCOM SR 2023-24 Page NO 344 Sl NO 25(a) Rs 1729.00 Labour Charges Rs 949.00 As per HESCOM SR 2023-24 Page NO 3...
Distribution Transformer Center (DTC)-11kV Pin Insulators (As per HESCOM SR 2023-24 Page No 349 Sl No 52 I No 6.06 Rs205.00
---- including cost of all materials, labor ,HOM,l
Distribution Transformer Center (DTC)-Releasing & Replacing of 11KV Dead End Insulators Disc,Strain etc( Labour Charges 58 Rs Page No 392 Sl No 108 I No 13.13
---- including cost of all ...
Distribution Transformer Center (DTC)-Guy Set Complete( AS per HESCOM SR 2023-24 Page NO 344 Sl No 24(a) Rs 1170.00 Labour Charges Rs 593.00 As per HESCOM SR 2023-24. Page No 344 Sl No 24(a))
Distribution Transformer Center (DTC)-Guy Set Complete( AS per HESCOM SR 2023-24 Page NO 344 Sl No 24(a) Rs 1170.00 Labour Charges Rs 593.00 As per HESCOM SR 2023-24. Page No 344 Sl No 24(a))
Distribution Transformer Center (DTC)-Concreting for Guy sets without cement( Labour Charges Rs 250.00 As per HESCOM SR 2023-24 Page 345 Sl 26 B (g)
---- including cost of all materials...
Distribution Transformer Center (DTC)-GI Wire 8 SWG ( As per HESCOM SR 2023-24 Rs 75.04 Page No 349.00 Sl No 61 I No 8.02)
---- including cost of all materials, labor ,HOM,l
Distribution Transformer Center (DTC)-Guy wire 7/10 SWG ( As per HESCOM SR 2023-24 Rs 77.23 Page No 349 Sl No 60 I No 8.01)
---- including cost of all materials, labor ,HOM,l
Distribution Transformer Center (DTC)-LT Protection Kit for 25/63/100 kVA As Per HESCOM SR 2023-24 Page No 353 Sl No 133 I No 17.01 rs 2023 Labour Charges RS 356 As per HESCOM SR 2023-24 Page No 393 S...
Distribution Transformer Center (DTC)-LT Protection Kit for 25/63/100 kVA As Per HESCOM SR 2023-24 Page No 353 Sl No 133 I No 17.01 rs 2023 Labour Charges RS 356 As per HESCOM SR 2023-24 Page No 393 S...
Distribution Transformer Center (DTC)-Releasing & refixing of LT Protection Kit for 25/63/100 kVA Labour Charges RS 356*1.9=676.4 As per HESCOM SR 2023-24 Page No 393 Sl 115 I No 15.03
Distribution Transformer Center (DTC)-Releasing & refixing of LT Wiring (From DTC to LT Line Through Metering Box & LT Protection Kit) 25/63/100 KVA TC( Labour Charges 949*190=853.1 As per HESCOM SR 2...
Distribution Transformer Center (DTC)-Releasing & refixing of 11kV Solid Core Type HG Fuse Unit Labour Chares Rs 237*1.9=450.3 As per HESCOM SR 2023-24 Page No 392 Sl No 97 I No 13.02
LT line-PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles) (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 (b) Labour Charge RS 1742.00)
---- including cost of all materials, lab...
LT line-PSC Pole - 9 Mtrs Long, 200 kg WL (for Intermediate Poles) (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 (b) Labour Charge RS 1742.00)
---- including cost of all materials, labo...
LT line-Release & Re-Fixing PSC Pole - 8 Mtrs Long, 200 kg WL. (As Per HESCOM SR 2023-24 Page No:399 Sl No.2 (e) Labour Charge RS 1425.00)
Labour Cost ---- including cost of all materials, labor ,HOM...
LT line-LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles),(As per HESCOM SR 2023-24. Page No 342 Sl No 13(c), Rs 423.00, Labour Charges Rs 160 As per HESCOM SR 2023-24. Pa...
LT line-LT 4 Pin cross arms, with pole clamps, bolts, nuts and washers (for PSC poles),(As per HESCOM SR 2023-24. Page No 342 Sl No 13(c), Rs 423.00, Labour Charges Rs 160 As per HESCOM SR 2023-24. Pa...
LT line-1.1 kV Pin Insulators with GI Pins,( AS per HESCOM SR 2023-24. Page No 349 Sl No 48 I No 6.02 Rs 66.00)
---- including cost of all materials, labor ,HOM,l
LT line-Releasing & refixing of LT Guy Set Complete,( As per HESCOM SR 2023-24. Page No 344 Sl No .24(c), Rs 1138.00, Labour Charges Rs 593.00 As per HESCOM SR 2023-24. Page No 344 Sl No 24(c))
LT line-Releasing & Restringing of Weasel ACSR Conductor, ( Labour Charges Rs 3180*1.90=6042 As per HESCOM SR 2023-24. Page No 390 Sl No. 64, I No 6.01)
---- including cost of all mater...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .