Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.7 LAccepted-AOC | ₹27.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹28.1 LRejected-Finance | ₹28.1 L | L2 | Rejected-Finance L2 |
| 3 | L3₹30.9 LRejected-Finance | ₹30.9 L | L3 | Rejected-Finance L3 |
Tender Value
₹38.3 L
EMD Value
₹76,600
Closing Date
12 Feb 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Providing and Laying Interlocking tiles work in Village- Thora (including Construction and Laying of Drain) YEA. WC-06
2026_YEIDA_1111842_6
YEA/GM(PROJECT)/2026/463 DT-29/01/2026
Open Tender
Civil Works
Item Rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹975
₹76,600
20 Jul 2026
3 Feb 2026
13 Feb 2026
3 Feb 2026
12 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m. Depth From 0.0 to 1.5 M below G.L. | 40.6 | Cum | 1 | ₹40.6 |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 58.74 | Cum | - | - |
| 3 | M-150 brick work in 1:4 cement and coarse sand of ( 2.2 fineness modulous) mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . | 107.69 | Cum | - | - |
| 4 | concrete with 2cm Guage Stone grit , Coarse Sand& Cement in the proportion of 4:2:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/279a/P-17 | 18.81 | Cum | - | - |
| 5 | Construction of Granular Sub-Base by providing close graded material, mixing in mechanical mix plant at OMC, carriage of mixed material to work at site, spreading uniform layers with motor grader on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 for Grade-1 material. (MORTH/(AR/YEIDA/Based on UPPWD/SOR-2020) | 123.83 | Cum | - | - |
| 6 | Providing and laying 80mm thick I.S.I. mark factory made cement concrete interlocking concrete paver block made by block making machine with strong vibratory compaction of approved size, design, shape, laid in required colour and pattern over and including average 50mm thick compacted bed local sand and filling the joints with fine sand all complete as per the direction of Engineer-in-charge with conforming to IS-15658 and IRC:SP:63. (AR/YEIDA/ Based on UPPWD/SOR-2020) | 1,651 | sqm | - | - |
| 7 | 12 mm cement plaster of mix:1:6(1 cement: 6 coarse sand) DAR-18/13.4.2/P-222 | 627.8 | sqm | - | - |
| 8 | Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to Plinth Level. Thermo-Mechanically Treated bars. (DAR/5.22.6/BasedonUPPWD/SOR-2020) | 463.74 | kg | - | - |
| 9 | Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. | 213 | Cum | 1 | ₹212.98 |
| 10 | Dry brick on edge flooring in required pattern with bricks of class designation 150 on a bed of earth including filling compressed, with M-150 bricks. (DAR/11.2/AR/YEIDA/Based on UPPWD/SOR-2020) | 1,651 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
6.pdf
Tender Documents • 1.43 MB
BOQ_2055915.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].