Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.2 LAccepted-AOC | ₹21.2 L | L1 | Accepted-AOC Lowest Rate So Accepted |
| 2 | L2₹21.3 LRejected-Finance | ₹21.3 L | L2 | Rejected-Finance Highest Rate So Rejected |
| 3 | L3₹21.5 LRejected-Finance | ₹21.5 L | L3 | Rejected-Finance Highest Rate So Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹21.2 L
EMD Value
₹21,500
Closing Date
26 Nov 2025, 5:00 pmClosed
Add. Chief Executive Officer
Z P Works Division Buldana
CONSTRUCTION OF GULBHELI TO DABHA ROAD (V.R.-108 )TA. MOTALA, DIST .BULDANA.CH. 00/00 KM TO 1/000 KM
2024_BULDH_1129947_11
22/2024-25
Open Tender
Civil Works
180 days
CONSTRUCTION OF GULBHELI TO DABHA ROAD (V.R.-1
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,180
₹21,500
20 Mar 2026
21 Nov 2025
28 Nov 2025
21 Nov 2025
26 Nov 2025
21 Nov 2025
Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area .CSR I No-2.07
Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. CSR Ino-2.18
Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with Power roller.CSR I No-2.24
Supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / Rubble at the road side breaking them to required gradation including conveying the boulders /Rubble and stacking the broken metal etc. complete a)80 mm Metal, By breaking Boulders (Hand broken). Km -1 .
Supplying hard murum/ kankar at the road site, including conveying and stacking complete. Km 1
Spreading 80/40 mm metal for road work including sectionong etc complete as directed by Engineer in charge . Item no. 50.58
Spreading hard murum/ soft murrum/ gravel or kankar for side width complete
Compacting the sub grade/gravel/oversize metal (200 mm loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Compacting the hard murum /kankar for all width (200 mm loose) l with Static roller including necessary, labour, materials and artificial watering complete.
Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete. (E CSR Item No.2.31) (Reference No.MORTH 408) (Additional Specification..MORTH 408 )
Royalty of Material
For 80mm Metal: Warer Absorption , Crushing Value/ Impact Value
For 80mm Metal Sieve Analysis.
for 80 mm Flakiness Index
Material Testing Charges for Hard Murum P.I. Value
Hard Murum Sieve Analysis
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
07_Gulbheli_B1.pdf
Tender Documents • 0.75 MB
BOQ_2155396.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid